Posted Apr 8, 2008, 6:13 PM
|
|
Registered User
|
|
Join Date: Aug 2006
Posts: 620
|
|
If you are looking at rail options for the HRM, I think you need to start smaller than LRT, and begin with a streetcar-like set up. It doesn't require any special right of ways and can integrate with most major roads thru town. Most importantly, it could be accessed at grade so it would require minimal station development.
|