View Single Post
  #337  
Old Posted May 16, 2013, 4:52 PM
Ragnar Ragnar is offline
Registered User
 
Join Date: Apr 2011
Posts: 188
Quote:
Originally Posted by Westsidelife View Post
Also from their Facebook page are renderings of the forthcoming "connector building" that will link TBIT with Terminals 4, 5, 6, 7, and 8. This will eliminate the need for passengers connecting between international and domestic flights to exit terminals and go through re-screening. Completion is set for winter 2015.
Thanks for the pics!

I thought the connector will only link TBIT and Terminal 4?

As far as I know, the tunnel between 4 and 5 is closed and will remain so, but the tunnel between 5 and 6 is open, and there is the connector between 6, 7, and 8. It would be cool if they could reopen the T4-T5 connector.
Reply With Quote