View Single Post
  #15  
Old Posted Jul 28, 2012, 5:36 AM
jtk1519's Avatar
jtk1519 jtk1519 is offline
Registered User
 
Join Date: Dec 2006
Posts: 975
Quote:
Originally Posted by USMichael View Post
This is going up quickly, any ideas of how long until it is finished
The first 10 floors are open (as of 7/2) and leasing with remaining opening by mid-January.


The salt water infinity-edge pool has an underwater soundsystem


An outdoor park is six-floors up and is just under one acre.


A poolside cabana at 1400 Hi Line.


Painting and finishing work is still ongoing at 1400 Hi Line.


The poolside seating at 1400 Hi Line.


The salt water infinity-edge pool has an underwater sound system.


Signage goes up at 1400 Hi Line.


An outdoor park that is six-floors up is just under one acre in size.

http://www.bizjournals.com/dallas/bl...=image_gallery
__________________
"I do not feel obliged to believe that the same God who has endowed us with sense, reason, and intellect has intended us to forgo their use." -- Galileo