Thread
:
DALLAS | 1400 Hi Line | 23 FlOORS
View Single Post
#
15
Posted
Jul 28, 2012, 5:36 AM
jtk1519
Registered User
Join Date: Dec 2006
Posts: 975
Quote:
Originally Posted by
USMichael
This is going up quickly, any ideas of how long until it is finished
The first 10 floors are open (as of 7/2) and leasing with remaining opening by mid-January.
The salt water infinity-edge pool has an underwater soundsystem
An outdoor park is six-floors up and is just under one acre.
A poolside cabana at 1400 Hi Line.
Painting and finishing work is still ongoing at 1400 Hi Line.
The poolside seating at 1400 Hi Line.
The salt water infinity-edge pool has an underwater sound system.
Signage goes up at 1400 Hi Line.
An outdoor park that is six-floors up is just under one acre in size.
http://www.bizjournals.com/dallas/bl...=image_gallery
__________________
"I do not feel obliged to believe that the same God who has endowed us with sense, reason, and intellect has intended us to forgo their use."
-- Galileo
jtk1519
View Public Profile
Find all posts by jtk1519