Posted May 9, 2014, 7:11 PM
|
Registered User
|
|
Join Date: Mar 2010
Location: Regina, SK (formerly Saskatoon)
Posts: 1,474
|
|
Back in 2010 I was told by a civil engineer working on the Bypass that $2M-2.5M was the cost of 4-lane divided. I think in the end it will be done. But time will tell.
|