They are not going to do any real digging for a few months, and when they start, it will be a 70 foot deep hole at Waterloo park where they will be able to lower the drilling equipment and head south. I'm still trying to imagine the inlet where the water will be directed. Its going to have to be built to prevent large debis and people from getting in, but how do you keep it from clogging at the same time? Curious to see the design. They will probably be able to get quite a bit of work done on the lake side before the tunnel connects to it. That will be an incredible day! Maybe not as incredible as the Chunnel. I would guess there will be access to the tunnel at least by a select few to document the occasion. Does anyone think some significant surface work can begin now along the creek, before the tunnel completion in 2014?