The following was posted by "Echoes" on the Saskatoon construction thread:

"Kay Nasser was on the Brent Loucks show on CKOM this morning. He says that the project is still moving ahead as planned, but the architectural design and drawings have taken longer than anticipated. He expects that the drawings will be submitted to the City in the next 2-4 weeks for a development permit, and groundbreaking is still expected this summer.

The project will take 3-5 years for full build out."

I am going to take this as good news. I don't think Nasser would be speaking publicly and giving timelines if this was not still moving forward. Looking forward to 'new' design being unveiled in a month and ground breaking this summer. Just disappointed about the full 'build out' potentially taking up to 5 years. To me, this leaves the loop hole to not fully commit to this and provide further delays. Would have liked to have seen this all built at once....
Reply With Quote