Thread
:
[New West] The Shops at New West (Plaza 88) | Completed
View Single Post
#
512
Posted
Apr 11, 2011, 1:57 AM
Spork
Shoebox Dweller
Join Date: Sep 2008
Location: Vancouver
Posts: 1,784
Here are some pics taken by me over the past week. There is a bit more concrete pouring to go. I think that it should be "topped out" by the end of May (perhaps not the theatre bit on the top).
Notice the brackets on the right for the pedestrian track overpass. These are brand new.
Fresh concrete:
Soon to be fresh concrete:
This structure is seriously quite massive.
Not certain on the configuration of this area. You can see them deconstructing the building to the left. This building fronts onto 8th street.
Spork
View Public Profile
Find all posts by Spork