View Single Post
  #11  
Old Posted Aug 2, 2013, 2:19 PM
Busy Bee's Avatar
Busy Bee Busy Bee is offline
Show me the blueprints
 
Join Date: Feb 2006
Location: on the artistic spectrum
Posts: 10,356
Agreed. As for the prelim schematic showing a possible heavy rail allignment, I must say I wish they would plan and build ahead of time a subterranean station in the lowest level,of the terminal and a future connection could tunnel under the GC and be completely climate controlled. Who wants to arrive at LGA in the winter with their fine luggage and stand at a windswept elevated platform? All that should be inside the terminal itself and that has to be planned for NOW.
__________________
Everything new is old again

There is no goodness in him, and his power to convince people otherwise is beyond understanding
Reply With Quote