View Single Post
  #17  
Old Posted Jul 19, 2006, 11:58 PM
Slugbelch Slugbelch is offline
`
 
Join Date: Jan 2006
Location: Ft. Lauderdale
Posts: 2,442
Palm J News:

The Palm tunnel completed


-Nakheel-

Nakheel has announced the completion of a sub-sea tunnel at The Palm, jumeirah.
Located 30 metres below sea bed level the tunnel is the first of such depth to be constructed in the U.A.E.
The tunnel, which was built by Al-Naboodah Engineering Services, connects one of the fronds on the western side of The Palm Jumeirah
with the cresent of the island and is one of the two tunnels that will be built on the project.
Reply With Quote