View Single Post
  #2564  
Old Posted Nov 12, 2010, 12:30 AM
s.p.hansen's Avatar
s.p.hansen s.p.hansen is offline
Exurb Enjoyer
 
Join Date: Sep 2010
Location: The Great Salt Lake, Utah
Posts: 2,257
The Old Viaduct


Image by KSL


Image by T-Mac


Image by KSL


Image by libel_vox

-------------------------------------------------------------------------

TRAX Airport Line Construction / North Temple Street Viaduct Rebuild Update


Image by KSL

Video Link



A lot of energy in the Viaduct project is currently being expended on finishing a new underground City Creek (the real one) conduit.

My previous picture:


The picture I took today:


In this new picture City Creek is now running so dry (as is common and natural in the later fall / winter months) that they are able to divert the water through some flexible, smaller, black, temporary pipes.





The actual viaduct structure is progressing quickly.









Last edited by s.p.hansen; Nov 12, 2010 at 1:07 AM.
Reply With Quote