Posted Apr 19, 2018, 1:33 PM
|
Registered User
|
|
Join Date: Apr 2012
Location: Winnipeg
Posts: 790
|
|
The bollards at the police station require a continuous underground concrete structure also. Those bollards will cost millions. JC Paving gave the low bid. I would be a little surprised if the city awarded it to someone else.
|