View Single Post
  #319  
Old Posted Apr 19, 2018, 1:33 PM
plrh plrh is offline
Registered User
 
Join Date: Apr 2012
Location: Winnipeg
Posts: 790
The bollards at the police station require a continuous underground concrete structure also. Those bollards will cost millions. JC Paving gave the low bid. I would be a little surprised if the city awarded it to someone else.
Reply With Quote