It's just white steel. They would eventually be primed and painted white in contrast to the hub's renderings.
Quote:
Originally Posted by SidewalkSuper
I am curious how the present parts of Greenwich Street are going to be brought up to the grade level of the section now being poured. There were 4 or 5 steps leading up to the walkway over the H beams, so there must be at least a 2 to 3 foot difference in elevation.
|
Greenwich Street is already at Street Level. The 2 or 3 foot difference will probably be used for street utilities, such as electrical equipment for lights, sidewalks, and sewage lines.