Posted Apr 20, 2019, 12:21 AM
|
|
Vires acquirit eundo
|
|
Join Date: Mar 2002
Location: Melbourne
Posts: 3,231
|
|
Incidentally, on either side of the station pit, under the black tarp/wrapping = the first two TBMs for the project, in parts naturally. They'll be assembled in the pit and sent on their way once excavation is done. They'll head west [toward bottom of the pic] first to the western portal and then disassembled, trucked back to this site, reassembled and then sent toward the city. The end point in the city is Melbourne Central - Aurora (the tower which is almost done in the pic above, with the gold scaffold near the top) is right next to Melbourne Central/State Library station.
|