Project Rundown

Unless noted otherwise, all projects for each location are arranged first by status, then by cost, if known (most to least expensive).

Status Order:
  • under-construction (listed first)
  • approved / proposed (listed second)
  • completed (listed third, newest to oldest)
  • demolished / destroyed (listed fourth)
  • canceled (listed last)

Kalamazoo

Code:
WMU "Hilltop Village", multi-phase, under construction (~ $500+ million)
(general location)

Source: WMU

Kalamazoo Country Club Expansion, under construction (~ $100+ million?)
1609 Whites Rd.

Source: MLive | City of Kalamazoo

KRESA Career Tech Center, under construction (~ $100 million)
5322 S. Sprinkle Rd.

Source: City of Kalamazoo

Zoetis Expansion, under construction ($95 million)
2605 E. Kilgore Rd.

Source: LinkedIn | Schweitzer Incorporated

530 S Rose St. (Senior Living), under construction (~ $25 million?)
(location)

Source: Second Wave Media | Kalamazoo County

WMU Hilltop Village Parking Structure + related, under construction (~ $15 million?)
(general location)

Source: WMU Capital Projects - Parking Structure

Eastside Square Mixed-Use (multi-phase), under construction (~ $10 million?)
(general location)

Source: InForm Architecture

Capital Health Group - Drug Rehab Facility, under construction (~ $5 million?)
1430 Alamo Ave.

Source: Kalamazoo Site Plan Review

215 E Michigan Ave., under construction ($4.2 million)
215 E Michigan Ave.

Source: MLive | Brad Devereaux

Children's Nature Playscape, Phase 2 under construction ($1.6 million)
(Phase 1 completed July 2022)
302 Academy St.

Source: WKZO

Inkster Avenue Bridge Reconstruction, under construction ($1.6 million)
(general location)

Source: City of Kalamazoo

Downtown Arena / Event Center, proposed ($300+ million)
(general location)

Source: MLive

Unnamed Plazacorp Development, proposed ($100 million)
(general location)

Source: Mike Krafcik | WWMT (edited)

2022 Kalamazoo College Master Plan projects, proposed (~ $70+ million?)
(general location)

Source: Kalamazoo College Facilities

Hard Rock Reverb Hotel & Gibson Guitar Museum, proposed (~ $50+ million?)
225 Parsons St.

Source: WWMT | Contributed

River's Edge (River Caddis Development), proposed ($55 million)
508 Harrison / 600 Gull Rd.

Source: MLive | Byce & Associates

The Legacy Senior Living, proposed ($26 million)
128 E Frank St.

Source: City of Kalamazoo

140 S Edwards St. Redevelopment, proposed ($25+ million?)
140 S Edwards St.

Source: miplace.org

Michigan & Kalamazoo Aves. 2-Way Street Conversion, proposed ($25 million)
(general location)

Source: Philip Gawel | WWMT

Arcadia Lofts, proposed (~ $20+ million?)
203 N Rose St.

Source: City of Kalamazoo | Bosch Architecture

Hawthorne Park, proposed ($18 million)
205 / 209 E. Stockbridge Ave.

Source: MLive

619 Porter Development, proposed ($13.2 million)
(general location)

Source: WWMT | Courtesy PlazaCorp LLC

Boys & Girls Club of Greater Kalamazoo, proposed ($11 million)
(general location)

Source: Boys & Girls Club of Greater Kalamazoo

City View in the Square Renovation, proposed ($6 million)
710 Collins St.

Source: WWMT | Courtesy CSI

GBC Affordable Housing Development, proposed (~$4 million?)
1101 N Westnedge Ave.

Source: Facebook | Clare Hollander

266 E. Michigan Ave. apartment conversion, proposed (~ $4 million?)
(location)

Source: City of Kalamazoo

809, 813, and 817 Porter Street, proposed (~ $3 million)?
(general location)
<no image available yet>

902 W North St / Jabez, proposed (~ $3 million?)
902 W North St.

Source: 7GenAE

718 N. Burdick St, proposed (~ $2 million?)
 718 N. Burdick St.

Source: City of Kalamazoo

Arcadia Creek Festival Place Redevelopment, proposed ($1.6 million)
145 E Water St.

Source: MLive | City of Kalamazoo

Whitley Memorial Funeral Home, proposed (~ $1 million?)
(general location)

Source: Intersect Studio

HOPE Project / Northside Tiny House Development, proposed (~ $1 million?)
(general location)

Source: MLive

Coffee Shop and Office, proposed (~ $500,000?)
1023 Riverview Dr.

Source: City of Kalamazoo

WMU John T. Bernhard Center built 1957
demolition proposed for 2024
(general location)

Source: My own photo, Feb. 20, 2024

WMU Valley 3 (Harrison / Stinson & Eldridge / Fox Halls) built 1965
demolition proposed for May-June 2024
(general location)

Source: MLive | WMU

WMU Dunbar Hall Renovation, completed February 2024 ($40 million)
(general location)

Source: My own photo, Feb. 19, 2024

NACD Infill Houses, completed early 2024 (~ $1.5 million?)
(general location)

Source: My own photo

Zone 32 / Bogan Development, completed December 2023 ($3.2 million)
(315 E Frank St.)

Source: City of Kalamazoo

Judge Charles A. Pratt Justice Center, completed December 2023 ($94 million)
(general location)

Source: MLive | Courtesy TowerPinkster

I-94 Widen & Portage Rd. Interchange rebuild, completed November 2023 ($87 million)
(general location)

Source: MLive | Courtesy MDOT

KDPS Station No. 2, completed October 2023 ($9.5 million)
(general location)

Source: Facebook | Becky Holland Fuller

Edison Academy, completed August 2023 ($18 million)
924 Russell St.

Source: MLive | Cory Morse

WMU Student Center and Dining Facility, completed July 2023 ($70+ million)
(general location)

Source: LinkedIn | WMU

ISK Behavioral Health Urgent Care, completed July 2023 (~ $5 million)
440 W. Kalamazoo Ave.

Source: My own photo

Woods Lake Square, completed June 2023 (~ $7 million?)
3110 Oakland Dr.

Source: My own photo

400 Rose Phase 2, completed June 2023 ($26.2 million)
234 W Cedar St.

Source: My own photo

1802 E Main, completed June 2023 (~ $500,000?)
1802 E Main St.

Source: LinkedIn | Southwest Michigan First

Heritage Community of Kalamazoo - Revel Creek, completed November 2022 ($60 million)
2400 Portage St. / 500 Golden Dr.

Source: City of Kalamazoo Site Plan Review

WP Diner @ Washington Square, completed September 2022 (~ $1.5 million?)
1324 portage St.

Source: MLive | Sophie Hillmeyer

Bank Street Farmers Market Expansion, completed summer 2022 ($10 million)
251 Mills St.

Source: MLive | Joel Bissell

Graphic Packaging International Expansion, completed summer 2022 ($600 million)
1810 N Pitcher St.

Source: City of Kalamazoo

Westgate Apartments, completed July 2022 ($4.7 million)
615 W Kalamazoo Ave.

Source: My own photo

LodgeHouse / Knights Inn Conversion, completed July 2022 (~ $5 million?)
1211 S. Westnedge Ave.

Source: City of Kalamazoo / INFORM Architecture

Yuma Way / Urban Gardens Cannabis, completed May 2022 (~ $500,000?)
617 Portage St.

Source: City of Kalamazoo | Driven Design

RAIR Dispensary, completed April 2022 (~ $2 million)
104 / 110 N Drake Rd.

Source: City of Kalamazoo / RAIR

Gospel Ministries Women & Children's Shelter, completed March 2022 ($10 million)
(general location)

Source: AVB

Brick + Brine (restaurant), in the Radisson, completed January 2022 (~ $1 million?)
100 W Michigan Ave.

Source: Open Table

Kalsee Credit Union, Milwood Branch, completed January 2022 (~ $1.5 million?)
3121 Portage St.

Source: LinkedIn | Schweitzer Inc.

The Monroe Building restoration, completed 2021? (~ $2 million?)
151 E Michigan Ave.

Source: LinkedIn | Treystar

Fraternity Village Apartments, completed fall 2021 (~ $500,000?)
1709 Fraternity Village Dr.

Source: LinkedIn | AVB

Kalamazoo College Natatorium, completed October 2021 ($18 million)
(general location)

Source: mortarr.com

Haymarket Plaza, completed September 2021 (< $1 million?)
(general  location)

Source: WWMT | Jason Heeres

Warner Building, a.k.a. CD12, completed September 2021 ($70+ million)
180 E Water St.

Source: MiBiz | Courtesy of Catalyst Development Co. LLC

Harrison Circle Apartments, completed August 2021 ($18 million)
(general location)

Source: Apartments.com

Kalamazoo Latvian Church, completed August 2021 (~ $2 million?)
100 Cherryhill St.

Source: LinkedIn | Intersect Studio

Home2 Suites, completed May 2021 (~ $28 million?)
(general location)

Source: MLive

Eastside City Life Teen Center, completed March 2021 ($3 million)
2528 E. Main St.

Source: GRBJ | Courtesy CD Barnes

The Creamery, completed March 2021 ($14.7 million)
1101 Portage St.

Source: Byce & Associates, Inc.

Bronson / Frank J. Sardone Cancer Pavilion, completed February 2021 ($60 million)
805 John St.

Source: Contributed

WMU Arcadia Flats Apartments, completed January 2021 ($60 million)
1760 Ring Rd S

Source: MLive | Joel Bissell

Chick-fil-A, West Main & Drake, completed January 2021 (Kalamazoo's first)
504 N Drake Rd.

Source: My own photo

Avid Hotel Kalamazoo East, completed early 2021 (~ $15 million?)
3717 East Cork St.

Source: My own photo

Oakland Drive Office Building, completed early 2021 (~ $1 million?)
(general location)

Source: LinkedIn | AVB

Cork Street Reconstruction, completed late 2020 ($6.5 million)
(general location)

Source: MLive | City of Kalamazoo

Hilton Garden Inn, completed November 2020 (~ $18 million?)
303 N Rose St.

Source: My own photo

MDHHS Office Building, completed November 2020 ($20 million)
427 E Alcott St.

Source: My own photo

St. Augustine Cathedral Upgrades, completed late 2020 ($2.8 million)
542 W Michigan Ave.

Source: Miller Davis

Honor Credit Union Stadium Dr. Member Center, completed August 2020 (~ $1.5 million?)
4400 Stadium Dr.

Source: Honor Credit Union

Bronson Lab Testing Facility, completed July 2020 (~ $6 million?)
400 John St.

Source: Instagram | TowerPinkster

Ascension Borgess Surgery Center Expansion, completed summer 2020 ($35 million)
1541 Gull Rd.

Source: AVB | Courtesy HED

400 Rose Phase 1, completed summer 2020 ($24.2 million)
400 S Rose St.

Source: AVB

The Exchange, completed mid-2020 ($53 million)
155 W Michigan Ave.

Source: Instagram | @byceassociate

Gilmore Apartments (conversion), completed 2020 (~ $6 million?)
100 Portage St.

Source: kalamazoostudios.com

Walden Woods Condominiums, completed 2020 (~ $15 million?)
(general location)

Source: Facebook | Hurley & Stewart

Eastside Gateway Small Homes, completed 2020 (~ $1.5 million?)
(general location)

Source: MLive | Winter Keefer

Old Central Center, completed 2019 (~ $1.5 million?)
827 S Westnedge Ave.

Source: loopnet

Honor Credit Union Downtown Connect Center, completed November 2019 (~ $1.5 million?)
148 E Michigan Ave.

Source: My own photo

First National Bank Renovation, completed fall 2019 (~ $2 million?)
318 W Michigan Ave.

Source: My own photo

The Montessori School expansion, completed summer 2019 ( ~ $1.5 million?)
750 Howard St.

Source: Kayla Miller | MLive

Newell Brands Design Center Expansion, completed summer 2019 ($7.3 million)
3300 Research Way

Source: Newell Brands | LinkedIn

The Park Club restoration, completed summer 2019 (~ $1.5 million?)
219 W South St.

Source: my own photo

216, 220 W Michigan Ave. mixed-use redevelopment, completed summer 2019 ($3 million)
216, 220 W Michigan Ave.

Source: loopnet

Parkway Flats Apartments, completed spring 2019 (~ $40 million?)
(general location)

Source: My own photo

Wightman Kalamazoo, completed early 2019 ($3.1 million)
433 E Ransom St.

Source: Wightman

Congregation of the Sisters of St. Joseph, completed 2018 (~ $20 million?)
2929 Nazareth Rd.

Source: Google Maps

Peregrine 100 (former First National Bank building), completed 2018 ($6 million)
108 E Michigan Ave.

Source: Peregrine Company

383 S Pitcher St. renovation, completed 2018 (~ $2.5 million?)
381 S Pitcher St.

Source: Lighthouse Realty

320 E Michigan Ave. Mixed-use conversion, completed 2018 (~$ 1 million?)
320 E Michigan Ave.

Source: apartments.com

Midtown Marketplace redevelopment, completed July 2018 ($9.5 million)
1693 S Westnedge Ave.

Source: Google Maps (October 2023)

WMU Richmond Institute for Design and Innovation, completed summer 2018 (~ $9 million?)
(general location)

Source: Progressive AE

Kalamazoo County DHHS, completed spring 2018 (~ $ 12 million?)
(renovation of former Illinois Envelope Company building)
311 E Alcott St.

Source: My own photo

600 Kitchen & Bar (part of The Foundry project), completed late 2017 (~ $2 million?)
600 E Michigan Ave.

Source: Eckert Wordell

The Foundry, completed July 2017 ($10 million)
600 E Michigan Ave.

Source: The Foundry Kzoo

Mall Plaza Apartments conversion, completed 2017 (~ $5 million?)
157 S Kalamazoo Mall

Source: apartments.com

Family Health Center - Alcott, completed April 2017 ($15 million)
505 E Alcott St.

Source: Eckert-Wordell

WMU Valley Dining Center, completed August 2016 ($36 million)
(general location)

Source: WMU

Gull Road Justice Complex, completed January 2016 ($23 million)
1536 Gull Rd.

Source: HOK

2700 West, completed August 2015 (~ $24 million?)
2700 W. Michigan Ave.

Source: Byce & Associates

Arcus Center for Social Justice Leadership, completed September 2014 ($5.2 million)
205 Monroe St.

Source: arch2o.com | Iwan Baan

Newell Brands Design Center, completed May 2014 (~ $16 million?)
3300 Research Way

Source: Perkins&Will

Corporation Hall apartment conversion, completed December 2012 (~ $5 million?)
154 S Kalamazoo Mall

Source: MLive

Peregrine Plaza (apartment conversion), completed 2012 (~ $9 million?)
(general location)

Source: Peregrine Company

WMU New Sangren Hall, completed summer 2012 ($60 million)
999 Rankin Ave.

Source: My own photo

Family Health Center - Paterson, completed July 2012 (~ $15 million?)
117 W Paterson St.

Source: Family Health Center

Girl Scouts Heart of Michigan Kalamazoo Regional Program and Training Center
Completed 2007 (~ $8 million?)
601 W Maple St.

Source: Grand Rapids Bride

WMU Richmond Center for Visual Arts, completed February 2007 $13 million)
(general location)

Source: Architect Magazine | Laszlo Regos

277 S Rose Street (Miller Canfield Building), completed 2006 (~ $18 million?)
277 S Rose St.

Source: AVB

Ascension Borgess Brain & Spine Institute, completed 2006 (~ $12 million?)
541 Gull Rd.

Source: AVB

Reformed Church (aka North Westnedge Church), built late 1800s
Demolished December 2023 - January 2024
1101 N Westnedge Ave.

Source: Flickr | Bill Dolak

American National Bank Building, built 1964
Demolished November-December 2023
1107 S Burdick St.

Source: Facebook | John Johnson

Whitley Memorial Funeral Home, built 1900
Demolished September-October 2023
330 N Westnedge Ave.

Source: My own photo

WMU Ernest / Smith Burnham Hall, built 1948
demolished January-February 2023
(general location)

Source: Instagram | WMU Facilities

WMU Davis, French, & Zimmerman Halls, built 1954-1960
Demolished mid-2021
(general location)

Source: My own photo (July 2021)

WMU Draper and Siedschlag Halls, built 1950
Demolished February 2021
(general location)

Source: Western Herald | Spencer Mathews

First Reformed Church, built 1871 
demolished January 2021
302 Academy St.

Source: MLive | Joel Bissell

Boatyard Brewing & Artist Studios, built early 1900's (old Standard Oil Co. Depot)
demolished July 2020
432 E Paterson St.

Source: Facebook | Jane Brewer

900 Block of W North St (x4 structures), built late 1890s - early 1900s
destroyed by arson & subsequently demolished in June 2020
(general location)

Source: MLive | Joel Bissell

Congregation of St. Joseph / Nazareth Motherhouse, built 1913?
Demolished March 2020 along with other former Nazareth College buildings
(general location)

Source: My own photo

Church of Christ Scientist, built 1914
Demolished August 2019
(general location)

Source: My own photo

WMU McCracken Hall, built 1949
Demolished 2017 (partial) & June 2019 (remainder)
(general location)

Source: Joel Bissel | MLive

WMU Elmwood Apartments, built 1954
demolished June-September 2018
(general location)

Source: Twitter | Edward Montgomery

251 E Lovell (former Upjohn Company Building 126), built 1967
demolished May-July 2018
251 E Lovell St.

Source: My own photo

Fountain of the Pioneers, built 1940
deconstructed spring 2018 ($200,000)
(general location)

Source: My own photo

WMU Old Sangren Hall, built 1964
demolished December 2012
(general location)

Source: MLive | Scott Harmsen

Bryant Mill / Allied Paper Corp., established 1895 (many buildings)
demolished 2004 - 2008
(general location)

Source: alliedpaper.net

Arcadia Commons West Master Plan, canceled (~ $100+ million)
(general location)

Source: Lord Aeck Sargent

Reedy Group 20-story Hotel Tower, canceled (~ $60+ million)
140 S Edwards St.

Source: MLive

440 S Burdick, canceled (~ $40 million?)
440 S Burdick St.

Source: City of Kalamazoo ZBA

116 W Cedar St, canceled (~ $20+ million?)
116 W Cedar St.

Source: MLive | Hollander Development Corp. / Byce & Associates Inc.

302 Academy St, canceled (~ $20+ million?)
302 Academy St.

Source: Byce & Associates

Supportive Recovery Housing, canceled ($10.5 million)
(general location)

Source: MLive | City of Kalamazoo
Battle Creek

Code:
Double Tree by Hilton, under construction (~ $60 million)
former McCamly Plaza Hotel conversion
(general location)

Source: Second Wave Media | BCU

Duncan Aviation Expansion, under construction ($40 million)
(general location)

Source: Battle Creek Enquirer | Provided

Redwood Battle Creek, under construction (~ $10+ million?)
(general location)

Source: Battle Creek Enquirer | Provided

99 & 103 W. Michigan Ave. Rehabilitation, under construction (~ $4 million?)
103 W. Michigan Ave.

Source: LinkedIn | BCU

Ralston Purina Co. Factory Redevelopment, proposed (~ $50+ million?)
150 McCamly St. South

Image Source: Alyssa Keown | The Battle Creek Enquirer

BCPS Northwestern Middle School / K-8 Arts Academy, proposed ($40 million)
176 Limit St.

Source: Battle Creek Enquirer | Battle Creek Public Schools / C2AE

Sophia Square, proposed ($20.6 million)
85 W. Michigan Ave.
<no image available yet>

Downtown Kalamazoo River Restoration, proposed ($20+ million)
(general location)

Source: Second Wave Media | Courtesy Battle Creek Whitewater
Bowers Aluminum Expansion, proposed ($7.8 million)
1401 Shiga Dr.

Source: Bowers Aluminum Co.

Housing-First Transition Housing, proposed (~ $6.5 million?)
535 W Van Buren St.
<no image available yet>

Battle Rock Climbing Gym, proposed (~ $3 million?)
50 W Michigan Ave.

Source: INFORM Architecture

Oak Hill Cemetery Chapel renovation, proposed ($300,000)
255 South Ave.

Source: Second Wave Media | John Grap

Kingman Museum, vacant / at-risk
175 Limit St.

Source: Battle Creek Enquirer

Bronson Behavioral Health Hospital, completed June 2023 ($35 million)
(general location)

Source: Wood TV 8 | Courtesy Rendering

New Holland Brewing, completed March 2023 (~ $3 million?)
64 W Michigan Ave.

Source: Phil Gawel | WWMT

Magna Cosma Casting expansion, completed fall 2021 ($31.9 million)
10 Clark Rd N

Source: Second Wave Media | Shabaka Gibson / BCU

IP USA Spec. Building (Zoetis Warehouse), completed September 2021 ($11 million)
(general location)

Source: Industrial Partners USA

WMU Aviation Education College Addition, completed September 2021 ($24 million)
237 Helmer Rd N

Source: WWMT | Lexie Petrovic

The Milton, completed spring 2021 ($36 million)
25 W Michigan Ave.

Source: Instagram | @michigan business

Summit Pointe First Step Psychiatric Urgent Care, completed Mar. 2021 (~ $20 million?)
175 College St.

Source: Second Wave Media

Kellogg's Innovation Suite, completed February 2021 (~ $2 million?)
2 Hamblin Ave.

Source: FSR Magazine | Courtesy Kellogg Company

One Nation - Tap & Table, completed January 2021 (~ $500,000?)
544 W Columbia Ave.

Source: https://onenationbc.com

Record Box / Handmap Brewing, completed 2018 - 2020 (~ $5 million?)
15 Carlyle St.

Source: felixandfingers.com

Battle Creek Police Department Station, completed August 2018 ($16 million)
20 N Division St.

Source: Schweitzer, Inc.

Bronson Family Medicine - Helmer Road, completed May 2017 (~ $5.5 million?)
2900 Watkins Rd, Battle Creek

Source: Bronson Health

Battle Creek Area Math & Science Center, completed December 2013 ($14 million)
171 Michigan Ave.

Source: Schweitzer

Former Kmart, built 1968
demolished spring 2021
200 Capital Ave.

Source: The Battle Creek Enquirer

Binder Building, built 1897
demolished December 2020
34 E Michigan Ave.

Source: My own photo
Portage

Code:
Pfizer Modular Aseptic Production building (MAP), under construction ($465 million)
(general location)

Source: MEDC | Courtesy Pfizer

PPS 2021 Bond Projects, under construction ($175.7 million)
Replace five elementary schools & remodel one
(multiple locations - new Haverhill Elementary rendering - pictured)

Source: Mlive

Tall Timbers, under construction ($47 million)
3413 W Centre Ave.

Source: MLive | City of Portage

Redwood Portage, under construction (~ $20 million?)
(general location)

Source: My own photo

Midwest Fastener Corp. Expansion, under construction ($11 million)
9031 Shaver Rd.

Source: LinkedIn | Wightman

FEMA Corporation Office Addition, under construction (~ $6 million?)
1716 Vanderbilt Ave.

Source: AVB

River Caddis Mixed-Use Development, proposed ($31 million)
(general location)

Source: MLive | Integrated Architecture / provided by City of Portage

Portage Creek Landing (mixed-use / multi-phase), under construction (~ $30+ million?)
(general location)

Source: Portage Planning Commission Agenda Packet

StoryPoint South, proposed (~ $50 million?)
8150 Creekside Dr.

Source: MLive | City of Portage

Kings Landing, proposed (~ $30 million?)
6601 Constitution Blvd.

Source: MLive | Integrated Architecture | Provided By City of Portage

Trilogy Health Services Senior Living, proposed ($14.3 million)
(general location)

Source: MLive | Henrickson Architecture + Planning

Foxwood and The Hermitage expansion, proposed (~ $12 million?)
4670 Fox Valley Ave.

Source: WWMT | Pat Hagan, Jon McCrary

Woodbridge Hills Expansion, proposed (~ $12 million?)
(general location)

Source: City of Portage

Westnedge Square, proposed (~ $2.5 million?)
5121 S Westnedge Ave. (Meijer Outlot)

Source: Loopnet

Portage Farmers Market, proposed ($2.5 million)
(general location)

Source: MLive | Rendering by Abonmarche

Lakeview Park Master Plan, proposed (~ $1+ million?)
(general location)

Source: MLive | City of Portage

IP USA Spec. Building, completed 2023 (~ $12 million?)
(general location)

Source: First & 42 | Greg Dilone

Springhill Suites, completed July 2023 (~ $16 million?)
(850 Trade Centre Way)

Source: hospitality.net | Marriott

Meijer Renovation, completed late 2022 ($40 million)
5121 S Westnedge Ave.

Source: Emily Reed | WWMT

Dr. Martin Luther King Jr. Park, completed fall 2022 (~ $500,000)
1000 M L King Dr.

Source: MLive | City of Portage

Infusion Associates, completed September 2022 (~ $2 million?)
1399 W Centre Ave.

Source: Google Maps | Infusion Associates

Charles & Lynn Zhang Portage Community Senior Center, completed May 2022 ($11 million)
203 East Centre Ave.

Source: MLive | Joel Bissell

Portage District Library Remodel & Expansion, completed May 2022 ($13 million)
300 Library Lane

Source: My own photo (July 2021)

Portage Northern Natatorium, completed August 2021 ($12 million)
5808 Oregon Ave.

Source: C2AE

Meridian FedEx Distribution Center, completed December 2020 (~ $40 million?)
6701 Portage Rd.

Source: RE Business Online

Portage Community Outreach Center Remodel, completed November 2020 (~ $2.5 million?)
325 E Centre Ave

Source: My own photo

Replacement Fire Station No. 2, completed October 2020 ($6 million)
6101 Oakland Dr.

Source: LinkedIn | AVB

Portage Central Middle School, completed August 2020 (~ $33 million?)
8305 S Westnedge Ave.

Source: Portage Public Schools

Bronson Primary Care Partners, completed July 2020 (~ $6 million?)
2700 East Centre Ave.

Source: Bronson Health

Buddy's Pizza, completed July 2020 (~ $250,000?)
5314 S Westnedge Ave.

Source: WWMT / Newschannel 3

Stryker Instruments R&D Center, completed mid-2020 ($154 million)
1941 Stryker Way

Source: HOK

Stryker Medical Expansion, completed 2020 ($109 million)
3800 E Centre Ave.

Source: Hurley & Stewart

SELINON Park Supportive Housing completed late 2019 ($15.4 million)
1603 E Centre Ave.

Source: SELINON Park / Full Circle Communities

Eliason Nature Reserve, Trailhead, & Trails, completed 2019 (~ $750,000)
(general location)

Source: My own photo

Celery Flats Trailhead Pavilion, completed summer 2019 (~ $600,000?)
7328 Garden Ln.

Source: Wightman

Portage North Middle School, completed August 2019 ($31 million)
1100 W Milham Ave.

Source: LinkedIn | C2AE / Jason Keen

Portage Central McCamley Field / Athletic Facilities, completed August 2019 
(~ $4 million?) 
8135 S Westnedge Ave.

Source: Facebook | Discover Kalamazoo Sports

Trade Centre III, completed 2018 (~ $22 million?)
650 Trade Centre Way

Source: loopnet

Portage Northern Huskies Stadium / Athletic Facilities, completed August 2018 
($3 million) 
1000 Idaho Ave.

Source: C2AE

Portage Central Natatorium, completed summer 2018 ($9 million)
8135 S Westnedge Ave.

Source: C2AE

Black Rock Bar & Grill, completed June 2018 (~ $3.5 million?)
550 Trade Centre Way

Source: Black Rock Restaurants

FEMA Corporation Expansion, completed 2018 (~ $6 million?)
1716 Vanderbilt Ave.

Source: LinkedIn | FEMA Corporation

Pfizer Cold Storage Warehouse (Building 541), completed February 2018 ($30 million)
7000 Portage Rd.

Source: My own photo

StoryPoint, completed early 2017 (~ $40 million?)
3951 W Milham Ave.

Source: Google User Content

The Upjohn Company Corporate HQ (Building 88), built 1959-1961
demolished 2007
(general location)

Source: SOM | Ezra Stoller

Trade Centre II, completed 2007 (~ $17 million?)
950 Trade Centre Way

Source: AVB

Trade Centre I, completed 2005 (~ $12 million?)
750 Trade Centre Way

Source: AVB
Oshtemo Township

Code:
WMU BTR Park Phase 2 Expansion, ongoing ($100+ million)
(general location)

Source: Fishbeck, Thompson, Carr & Huber, Inc.

Corner@Drake retail development, ongoing ($100+ million)
(general location)

Source: My own photo

FlavorSum Expansion, under construction ($10 million)
3680 Stadium Park Way

Source: Executive Office of the Governor / WWMT

Kalamazoo National Guard Armory Renovation, under construction ($5 million)
5353 Parkview Ave.

Source: WWMT | Maria Serrano

US-131 Business Route Interchange Completion, proposed ($20 million)
(general location)

Source: MLive

District No. 10 School House Rehabilitation, proposed (~ $1 million?)
near Stadium Dr. and 9th St.

Source: WMUK | Sehvilla Mann

Hamptons Plaza, completed November 2023 ($4 million)
6289 W. Main St

Source: MLive | Joel Bissell

Advia Credit Union HQ, completed late 2021 (~ $35 million?)
6400 West Main St.

Source: Joel Bissell | MLive

Ascension Borgess Cancer Center, completed September 2021 ($20 million)
(general location)

Source: Fishbeck, Thompson, Carr & Huber, Inc.

Consumers Credit Union Branch, completed July 2020 (~ 2.8 million?)
5018 W Main St.

Source: My own photo

Bronson Primary Care Partners, completed July 2020 (~ $6 million?)
6210 W Main St.

Source: My own photo

Holiday Inn & Suites Kalamazoo West, completed fall 2019 (~ $16 million?)
1247 Westgate Dr.

Source: IHG

Holiday Inn Express & Suites Kalamazoo West, completed summer 2019 (~ $12 million?)
1315 Westgate Dr.

Source: IHG

Delta (Marriott) Hotel & Conference Center remodel, completed spring 2019 ($4 million)
2747 S 11th St.

Source: marriott.com

Natural Flavors (FlavorSum) Production Facility, completed c. 2018 (~ $14 million?)
3680 Stadium Park Way

Source: LinkedIn | Tower Pinkster

Latitude 42 Brewing Co., completed February 2018 (~ $3 million?)
6101 W Main St.

Source: Wood TV 8
Kalamazoo Township

Code:
Kalamazoo Central HS Exterior Renovations, under construction ($4 million)
2432 N Drake Rd.

Source: My own photo, Feb. 17, 2024

Derek Jeter Baseball & Softball Fields, completed November 2023 ($5 million)
2432 N Drake Rd.

Source: Joel Bissell | MLive

C&D Recycling Center, completed fall 2023 ($4 million)
(general location)

Source: WWMT

KPS Transportation Center, completed August 2020 ($6.8 million)
1800 Ravine Rd.

Source: WWMT Newschannel 3 | Matt Miller

Kalamazoo County Animal Services & Enforcement Facility, completed November 2019 
($5 million)
1316 Lamont Ave.

Source: MLive | Joel Bissell

40 Winks Motel, built 1954
demolished November 2023
2605 Douglas Ave.

Source: Facebook | Dorothy Decker
Texas Township

Code:
Authentix Kalamazoo, under construction (~ $50 million?)
(general location)

Source: Continental Properties

PSY Rehab Clinic, under construction (~ $12 million?)
5802 S 9th St.

Source: My own photo

Lofts on Q, under construction (~ $8 million?)
(general location)

Source: My own photo (10/2/23)

KVCC Skilled Trades Renovation & Expansion, proposed ($40 million)
(general location)
<no image available yet>

Schafer Development (166 apartments), proposed (~ $40 million?)
(general location)

Source: MLive | Schafer Development

New Township Hall, completed December 2023 (~ $8 million?)
7227 W Q Ave.

Source: Texas Township

Bronson Outpatient Surgery Center, completed July 2023 ($19.3 million)
(general location)

Source: My own photo

Redwood Texas Township, completed 2021 (~ $30 million?)
(general location)

Source: My own photo

Camp Rota-Kiwan - a New Kalamazoo County Park, purchased March 2021 ($2 million)
(general location)

Source: Kalamazoo County (modified)

Bronson Primary Care Partners - 9th St, completed July 2020 (~ $6 million?)
5973 Beatrice Dr.

Source: Bronson Health

Bronson Primary Care Partners - Texas Corners, completed July 2020 (~ $6 million?)
8088 Vineyard Parkway

Source: Bronson Health

Consumers Credit Union HQ, completed December 2017 ($32 million)
7200 Elm Valley Dr.

Source: AVB
Comstock Township

Code:
RCKC New Facility, completed March 2024 ($65 million)
4400 S 26th St.

Source: WKZO | Courtesy RCKC

Charles & Lynn Zhang Animal Care & Resource Center (Kalamazoo Humane Society), 
completed late 2020 (~ $5 million?) 
2272 River St.

Source: Byce & Associates

Fairfield Inn & Suites, completed April 2019 (~ $14 million?)
3303 Retail Place Drive

Source: My own photo

Morrow Generating Station, for sale ($1.44 million)
(general location)

Source: WKFR / Loren Souers | Kalamazoo Commercial Real Estate


















...
Emmett Township

Code:
FireKeepers Casino Expansion, completed August 2021 (~ $30+ million)
11177 E Michigan Ave. (Emmett Township)

Source: Battle Creek Enquirer | Courtesy Firekeepers Casino




















...
Richland Township

Code:
Gull Lake Community Schools 2018 Bond Projects, completed spring 2022 ($65 million)
Pictured: Gull Lake Community Schools Center for the Fine Arts (general location)

Source: 2018 Bond - Gull Lake Community Schools

Bronson Primary Care Partners, completed July 2020 (~ $6 million?)
8906 M-89

Source: Bronson Health






















...
Pavilion Township

Code:
Abbey42, under construction  ($65 million)
5283 East O Ave.

Source: Second Wave Media | Courtesy Westwind Construction



















...
Ross Township

Code:
South Kitchen, completed November 2020 (~ $1 million?)
12454 E D Ave.

Source: Facebook | South Kitchen

























...
Village of Vicksburg

Code:
The Mill at Vicksburg, under construction ($85 million)
300 W Hwy St.

Source: Second Wave Media | Courtesy The Mill at Vicksburg

New Municipal Building, completed December 2023($2.5 million)
(126 N Kalamazoo Ave.)

Source: Facebook | Village of Vicksburg

Oswalt Park Revitalization, completed June 2022 (~ $150,000?)
109 N Main St.

Source: Patronicity

Mackenzies Bakery, completed April 2022 (~ $500,000?)
103 E Prairie St

Source: Facebook | Mackenzies Bakery

Roxie's Breakfast & Lunch (formerly Michelle's), completed December 2021 (~ $1.5 million?)
343 W Prairie St.

Source: WKFR (via Roxie's)

Kalsee Credit Union remodel, completed late 2021 (~ $1.5 million?)
119 N Main St.

Source: LinkedIn | Kalsee Credit Union

Rim and Rail Event Venue, completed summer 2018 (~ $500,000?)
343 W Prairie St.

Source: Rim and Rail
Galesburg

Code:
KRVT Expansion (Campaign Connnect), proposed ($1 million)
(general location)

Source: WKZO | Courtesy Parks Foundation of Kalamazoo County

Bronson Primary Care Partners, completed July 2020 (~ $3 million?)
10310 Miller Dr.

Source: Bronson Health











...

Last edited by deja vu; Today at 4:34 PM. Reason: updating project rundown
Reply With Quote