Posted Jun 27, 2008, 2:23 PM
|
Registered User
|
|
Join Date: Mar 2007
Location: Philadelphia, PA
Posts: 50
|
|
This is crazy, but not necessarily impossible. There will be large and irregular loads, but they can be solved with a more massive core. As for utilities of all sorts, I would run them back into the core underneath the flooring, and then hook them into building-wide main lines. Obviously there is only one exact center of rotation, so some fancy and flexible piping would be needed, but it should be possible.
|