This is crazy, but not necessarily impossible. There will be large and irregular loads, but they can be solved with a more massive core. As for utilities of all sorts, I would run them back into the core underneath the flooring, and then hook them into building-wide main lines. Obviously there is only one exact center of rotation, so some fancy and flexible piping would be needed, but it should be possible.