View Single Post
  #8911  
Old Posted Jan 11, 2018, 4:16 AM
Jerry of San Fran's Avatar
Jerry of San Fran Jerry of San Fran is offline
Registered User
 
Join Date: Jun 2007
Location: San Francisco
Posts: 1,553
Earthquake Retrofit - Fox Plaza Office/Apartment Building

This picture is the earthquake retrofit that is being done in the apartment area of the Fox Plaza. Metal flanges will be welded to the steel beams in the closet of apartments. Tenants affected will have to vacate to a temporary apartment for 19 days. I am not affected by the retrofit (except for the reduced elevator service).

The retrofit in the office section of the building will be done with steel beams placed at an angle on the inside perimeter.

The 4.4 earthquake 12 miles from my apartment building was a reminder that we live in an earthquake zone. It was quite a jolt in my apartment last week!

II Earthquake Retrofit_new reinforcement plates at top of bottom of flange by Jerry, on Flickr
__________________
(Essex) Fox Plaza 52nd year resident in 2023 - (the building everyone loves to hate :------>))
Reply With Quote