Posted Feb 19, 2015, 10:43 PM
|
|
Registered User
|
|
Join Date: Feb 2015
Posts: 312
|
|
I had a chance to speak with a Frontrunner engine operator. He said electrification might happen sooner than you would think. This makes me wonder, at what point would frontrunner require double tracking and then electrification?
The 2040 goal is 15 minute frequencies in each direction, but at what level of ridership would this be deemed necessary?
|