View Single Post
  #1056  
Old Posted May 18, 2015, 11:30 PM
eternallyme eternallyme is offline
Registered User
 
Join Date: Mar 2009
Posts: 5,243
I just thought...what is the progress so far on the Greenbank-VIA grade separation?

I believe it is the first railway-road bridge built in Ottawa since 1994 (when the Bank Street underpass was replaced concurrent with the Southeast Transitway).
Reply With Quote