View Single Post
  #205  
Old Posted Mar 30, 2010, 5:31 PM
RobH's Avatar
RobH RobH is offline
Registered User
 
Join Date: Mar 2009
Location: London / Kent
Posts: 109
Velodrome:

The cable-net roof is in place and the roof panels are going to be dropped square by square into this structure. The structure will be watertight by the summer and the track will start to be laid in the Autumn




Last edited by RobH; Apr 1, 2010 at 2:32 PM.
Reply With Quote