Originally Posted by CanSpice View Post
Yes, and that's the stretch of Braid that has Royal Columbian Hospital on it, so if two of the goals of this project is to improve access to RCH and reduce air pollution around RCH, then only Option C meet those goals. That's why I brought up the traffic volumes near RCH.
I suppose if you only limit yourself to the options currently on the table, then Option C only meets that goal.

If you want to do either of my partial or full closures to the Brunette interchange, include the new intersection of Brunette and Braid in the sketch above (except instead of a T intersection include an arm on the New West side of Brunette), close the existing rail crossing, and build the tunnel connection to New West as shown in Option C, that would be fine.

You don't need to destroy Mallardville to "fix" (whatever your definition of fix is) the connection to New West.

Besides, the traffic in New West is going to right itself as soon as the Putello tolls come into place. I loved the weekend closures over the summer. It was the only time I could pick up my buddy in New West for golf without wanting to punch my steering wheel!