Originally Posted by dansk View Post
I was talking to a buddy at the AB goverment that was involved. The `concept` in the video was just a place holder, nothing else. The final design will look much different.
correct - place holder is an excellent description. the selected bridging consultant (those submissions are due today) will develop and provide a conceptual design for comparison against the design build teams' submissions. the bridging consultant's conceptual design will remain an internal document that will not be made available to the design build proponents but will be used to write the "procurement" documents and will be used to assess the design build teams' submissions along with constructability, budget, schedule and "other factors that constitute a complete proposal".