Here is the final design for the planned 3,000 seat Steven Tanger Center for the Performing Arts in downtown Greensboro. Construction will begin late summer. While the design is not bold as some performing arts centers, Its an impressive design and I love the limestone facade in combination with the glass. The center will feature a roof top terrace overlooking LeBauer City Park which is now under construction
http://myfox8.com/2016/01/27/design-...boro-unveiled/
__________________
Greensboro, North Carolina (home of the Atlantic Coast Conference) population - 301,000
Last edited by urbanscraper; Jan 28, 2016 at 1:48 AM.
|