Construction Updates:

Construction of Trump Tower (Vancouver, 63flrs) is nearing completion.

Photo taken on May 25 by SSP user mcminsen

Also nearing completion is 1245 Harwood St. (Vancouver, 17flrs)

Photo taken on May 25 by SSP user mcminsen

Three Civic Plaza (Surrey, 48flrs)

Photo taken on May 26(?) by SSP user Shift

Construction for the first two towers of The Amazing Brentwood (Burnaby, both 56flrs) is above grade. In the background, construction of the second tower of Solo District (Altus) has progressed beyond the office podium.

Photo taken on May 14 by SSP user mcminsen

Modello (Burnaby, 37flrs)

Photo taken on April 28 by SSP user vanman

Elliot Street (New Westminster, 18flrs)

Photo from GBL Architects twitter Link

Excavation is underway for 1155 Thurlow St. (Vancouver, 22flrs), which also has a new look:


Both photos taken on May 26 by SSP user mcminsen

Only five floors to go before 1107 Seymour (Vancouver, 15flrs) is topped out.

Photo taken on May 27 by SSP user mcminsen

Construction for Vancouver House (Vancouver, 52flrs) is still well below grade.

Photo taken on May 27 by SSP user mcminsen

The Independent (Vancouver, 21flrs)

Photo taken on May 27 by SSP user mcminsen

Exterior work for One Pacific (Vancouver, 17flrs) appears to be complete. Behind it, construction of Parq Vancouver has reached a few levels above grade. In the Background, the south tower of the Rogers Arena complex will top out at 32 floors.

Photo taken on May 23 by SSP user mcminsen

Addition (Vancouver, 20flrs)

Photo taken on May 27 by SSP user mcminsen

Some site prep appears to be underway for the first tower of Burrard Place (Vancouver, 54flrs).

Photo taken on May 27 by SSP user mcminsen

Excavation for Prime at the Plaza (Surrey, 37flrs) is complete. Behind it is the first tower of University District.

Photo taken on May 5(?) by SSP user Shift

Park Avenue East (Surrey, 40flrs/36flrs)

Photo taken on May 2 by SSP user Shift

Centreview (North Vancouver, 24flrs/17flrs)
CentreView, North Vancouver by chrisjohann, on Flickr

Excavation has started for 288 East Hastings St. (Vancouver, 12flrs)

Photo taken on May 10 by SSP user mcminsen

The Exchange (Vancouver, 31flrs)

Photo taken May 15 by SSP user mcminsen

633 Main St. (Vancouver, 15flrs) is complete.