View Single Post
  #69  
Old Posted Dec 24, 2013, 6:56 PM
yakra's Avatar
yakra yakra is offline
Roadgeek
 
Join Date: Sep 2012
Location: Portland ME
Posts: 16
Now that the Hwy 2 / Hwy 543 interchange is open, how far east is Hwy 543 signed?
GIS Shapefiles from 2013 show the 543 designation ending at a realigned 96 Street East, east of the new Highwood River bridge.
Google Street View imagery from 2012 shows the new road open to traffic, but Hwy 543 is only signed to the west.
Wondering if the extension of the 543 number (vice just the physical road itself) is waiting on the Hwy 2 interchange opening, the roadway being twinned, or what.

Also: Does the new AB2 interchange have a signed exit number?

TIA!
Reply With Quote