Here are some quick photos taken by me yesterday:





Here is some finishing being done at mezzanine level. The windows extend all the way down.



The close hole is the west station escalator (existing) and the further hole is for a future escalator.


Starting on the scaffolding for the next level, which should start to be quite interesting as they enclose the mezzanine level. The roof here will be the Safeway roof.



This is looking towards the white heritage building with the Eastbound escalator/stairs (existing) as the angled concrete thing on the left.


The frame for the theatre is basically as far as it can go before they pour that level further along (I estimate 2-4 weeks).


This one is pretty blurry, but is looking down from track level down to where those windows/doors were.