View Single Post
  #19922  
Old Posted Feb 7, 2012, 2:08 PM
pnapp1's Avatar
pnapp1 pnapp1 is offline
Brooklyn Baby!
 
Join Date: Apr 2011
Location: L.I. New York
Posts: 263
Quote:
Originally Posted by crewex View Post
ANOTHER SLOW DOWN, MORE COST, ETC.


A report I just read indicated that a massive oversight in the positioning and time line of the WTC 1's sub level loading docks are blocked by the temporary path station and will therefore impede the ability for tenants to move in by the completion date. As a result, for an extra cost of more than 50 million, temporary loading docks will have to be erected until the new path station is completed, and the old temporary one is removed.

Thanks alan for the update, 9 trucks!! how many lengths of steel are on a truck?! is it all for WTC 1?
Old News!