Here's the full laundry list of alleged deficiencies from the Statement of Claim. I guess in any project of sufficient magnitude you're going to run into a few issues and shortcomings. But even though some of this stuff is tiddlywinks and a matter of one's personal opinion, there are undeniably some major issues in the mix and on the whole it does seem like a bit more than one might reasonably expect.
(a) lack of handicap accessible design relating to door openers and at suite level;
(b) replacement of guard railings in seating areas;
(c) guard rails around roof top equipment lacking;
(d) insufficient field exiting;
(e) water infiltration into private suites;
(f) water infiltration from North and South video board steel structure;
(g) contractors’ construction deficiency list items not completed;
(h) East crawlspace not backfilled;
(i) gate canopy drainage issues;
(j) rainwater leader drainage piping connection failures;
(k) water migrating into the facility due to a compromised building envelope;
(l) water ponding on the North and South Concourse areas;
(m) extensive Concourse slab cracking;
(n) heating and insulation issues:
(i) inadequate design to maintain original design temperature of 10 degrees Celsius in suite levels year-round;
(ii) lack of thermal insulation, thermal break, and weather proofing of suite level;
(iii) lack of suitable thermal insulation throughout (Administrative Building north wall, Administrative Building Floor, Pinnacle Club);
(iv) lack of enclosure of the East crawlspace under the Administrative Building resulting in a cold floor slab throughwinter;
(v) lack of heat in all mechanical, sprinkler and electrical rooms that function through all four seasons;
(vi) lack of heat in concession area for cold weather operational use;
(vii) lack of weather stripping of all doors;
(viii) lack of heat tracing on piping exposed to freezing (sprinklers, water and drainage);
(ix) inadequate Administrative Building HVAC controls, air distribution, heat, and cooling;
(x) inadequate consideration of mechanical systems winterization design for entire facility;
(o) lack of structural design capacity of Concourse slabs to satisfy venue requirements for operational loading;
(p) lack of positive floor system drainage to internal floor drains (Training Room);
(q) imbedded stair nosings’ design/installation poorly resolved;
(r) poor coordination of building services - exit corridor in the basement required the addition of a rated ceiling;
(s) extensive sidewalk settlement around the perimeter of the facility;
(t) water in “dry” pits housing backwater valves causing rusting of valves;
(u) mould issues due to water migration into walls;
(v) dangerous ice accumulation on sunshades;
(w) no all-weather route past truck access to field due to inadequate clearance in original design;
(x) exterior finishes subject to vandalism damage;
(y) no access ladders to upper roof canopy hatches;
(z) exposed steel not painted or sealed;
(aa) sprinkler system design type for suite levels unsuitable due to lack of heat;
(bb) lack of fire proofing on the steel structure supporting the Administrative Building roof, South Patio and North Concessions;
(cc) inadequate entrance gate design;
(dd) no hose bibbs in seating sections for pressure washing seats;
(ee) no hose bibbs in landscaping areas;
(ff) no power provided for broadcast trucks;
(gg) inadequate design of domestic hot water boilers requiring early replacement;
(hh) no strainers provided over roof canopy drains and trench drains;
(ii) no internal barrier free route between upper level football offices and lower level football operations;
(jj) Commissary not located in proximity to event areas; no all-weather route between Commissary and event areas on east side of building;
(kk) inadequate storage in building and around site;
(ll) inadequate provision of service elevators;
(mm) weight restrictions on all Concourse levels due to slab design and composition. This limits weight and amount of product and weight that can be moved around stadium, a problem for moving kegs of beer for instance. Man lifts and equipment. are limited in their capacity;
(nn) no incoming internal material handling and storage area was provided;
(oo) poor layout of dock scissor lift controls; and
(pp) no barrier free route from parking to Administrative Building entrance;
(collectively the “Deficiencies”)
|