View Single Post
  #9  
Old Posted Sep 2, 2018, 5:13 PM
mumu mumu is offline
Registered User
 
Join Date: Sep 2017
Posts: 140
Quote:
Originally Posted by The ATX View Post
This is probably the same thing as the Waterfront site plan that was posted to AULCC on 08/23. I never got around to posting it, but it shows a new south wing office complex and an extended parking garage. It's 77 pages and very slow loading.

ftp://ftp.ci.austin.tx.us/ATD_AULCC/...02_PLAN_01.pdf
Thanks, this is for what I was looking.

The new building is going to be squeezed in between the Azul (apartment building) and the parking garage.
This is leaving them a lot of known empty lot space still, especially all the area south of Elmont (where all the slabs are.) They're really "packing it in" with the new building instead of creating more open space between buildings.
Reply With Quote