Thanks Steve for posting the website.
Here is the update on The Century from the website:
Quote:
January 2008
The tower structure has reached level 8 with a 6-day-per-floor cycle. The MEP rough-in is progressing through level 3 and the top track has begun on level 3 and 4. The exterior skin of precast for the high-rise and exterior stone for the low-rise is set to begin this month.
|
All pictures from Webcor
Still looking for pictures of the Carlyle.