All pictures by me. Taken on my iPhone 4, if you're wondering about the low quality of some of them.
This should be the Taxiway J underpass construction. Pretty damn close to those tanks!
The control tower is getting pretty close to the top!
Taxiway F tunnel. You can see the two different roads being built under it here. One is private, one is public.
More Taxiway F.
The first bit of runway is getting the base done!
Looking down the runway towards the Airport Trail tunnel. Those wires will be covered in about 16 inches of concrete.
The view of the first 300m or so runway taking shape. About 4km to go!
On a slightly amusing note, this is the legendary proof roller. Yes, it's out of place here.
A section of the Airport Trail tunnel nearing completion before being backfilled.
Looking East from the last shot.
Looking West. They were pouring concrete when we were there, so we couldn't go any closer to the tunnel than the top of the sideslopes.
The best view I could get inside.
What the majority of the completed pour looks like.
Pouring a new section of the tunnel.
The remainder of the West side of the tunnel to be made.
The slip forms are on rails to be moved easily to the next section. The rounded corners apparently help deflect explosive energy back downwards.
The remainder of the East side of the tunnel trench.