View Single Post
  #10  
Old Posted Oct 25, 2008, 8:12 PM
Richard Eade Richard Eade is offline
Registered User
 
Join Date: Mar 2008
Location: Nepean
Posts: 1,952
Quote:
Originally Posted by waterloowarrior View Post
As part this development, the CCTBS will be integrated with a realigned and grade separated (buried) transit station that will accommodate buses and light rail. The redevelopment of the transit station supports the Official Plan vision as well as recently prepared mixed-use development concept for the Centrepointe area. The Site Plan will also accommodate the extension of Navaho Drive and College Avenue as signalized intersections crossing Woodroffe Avenue to the north and south of the site plan area. A glass pedestrian bridge is envisioned above Woodroffe Avenue connecting the existing buildings east of Woodroffe to the CCTBS building and transitway. Each of these associated but independent municipal projects are subject to various studies and processes that will be considered as part of any approval of the CCTBS site plan.
Yes, it is early in the design process and many things need to be studied. However, is it ever too early to start thinking of the requirements?

The presented information is, I would guess, more of a 'block diagram'. It basically shows that a buried Transitway station would be included and it's general position.

What I am suggesting is part of a future step: Taking into account the transit system which must be accommodated by the station. I am suggesting that in order to get two bus lines crossing (the west-east BRT and the south-west Transitway) as well as including a terminus for the LRT line (which I hope will be extended south), there could be a need to have two levels. One for trains and one for buses.
Reply With Quote