The second tower of the NCR campus looks to be a go. It's still in the design phase but is expected to be completed by 2019 and help bring 5300 jobs to Midtown.

http://www.bizjournals.com/atlanta/n...ill-bring.html
Can someone with a construction background answer this:
In the ABC article it stated phase II of the project would be 250,000 square feet (Office + Retail) and the cost is $140 Million. I was like WTF.

Doing some math: Average building cost per sqft ($146.11) x building size (250,000 sqft) = $36,527,500.

How the hell is this a $140 Million building? Is it made out of gold?

http://evstudio.com/cost-per-square-...ion-by-region/