View Single Post
  #53  
Old Posted Sep 12, 2016, 5:40 PM
The ATX's Avatar
The ATX The ATX is offline
Moderator
 
Join Date: May 2006
Location: Where the lights are much brighter
Posts: 12,058
A new site plan was filed after the original one was withdrawn. The floor count according the project description has been reduced to 31-stories. The new elevations are not available yet.

https://www.austintexas.gov/devrevie...erRSN=11586407
__________________
Follow The ATX on X:
https://twitter.com/TheATX1

Things will be great when you're downtown.
Reply With Quote