Quote:
Originally Posted by hfx_chris
The four approaches? Huh?
Good, good. Permanent signs I assume, not just those ones they wheel in place every time they do construction...
|
The two bridges (four approaches) on the Dartmouth side of MacKay Bridge (Windmill Rd and Princess Margaret Blvd). Yep they will be permnament signs. I think they said 3 on each side of the bridge.
Quote:
Originally Posted by hfx_chris
That'll be good; I know they're doing construction under the overpass, hopefully resurfacing, that whole stretch is a huge mess.
|
The Q&A section on their website implied they are going to redo the whole interchange. They said they are in the design phase and construction should begin later this year.
Quote:
Originally Posted by hfx_chris
Ugh, I hope it's not that shade of puke green they have in some spots...what's wrong with dark green?
|
Yep that's the colour. They said they have some of it done already.