Posted Sep 15, 2011, 3:29 AM
|
|
Registered User
|
|
Join Date: Jul 2010
Location: #dtphx
Posts: 175
|
|
FYI:
The Concord Eastridge project has a zoning hearing Thursday morning 9am @ City Hall, 1st floor.
They are requesting a deeper setback off of Roosevelt because of the (inexplicably above ground) power lines that impede their ability to build to the street. Not acceptable. The power lines must be buried. (Or the no-build zones must be reduced.)
They're also going in for a 2nd variance request -- something about ROW usage for loading/unloading/trash or something. Not sure what that one's all about yet. Looks like I'll have to go and see.
|