Quote:
Originally Posted by njjeppson
|
When did the Orange Line go under construction?
Quote:
Originally Posted by Wattleigh
The 5 lines were approved last October. METRO is starting to open offices at one point along each of the corridors to do the design work from within the neighborhoods. Designs and Funding are the next hurtles to cross and will be resolved in time.
|
I think the cool maps nj posted made him jealous. METRO's maps are boring to look at and are all PDF files and not JPGs.
Oh, and I hate UP. I wish BNSR built more lines around Houston than UP did. UP sucks.