The option that was chosen, a modified test line that uses the existing infrastructure to the best of its ability, was estimated to cost $95.5 million back in a study done in July of 2007.
A full-on line, that would build extra infrastructure as opposed to using existing freight lines and Amtrak service, would cost $618 million to $1.5 billion.