Posted Feb 14, 2018, 3:55 AM
|
Registered User
|
|
Join Date: Jun 2013
Location: WA
Posts: 18
|
|
The first setback is visible at the top left of this photo. The top shown extended concrete floor is the 51st floor and the first open windbreak level. Levels above will not extend that far to the left. Note the scaffolding has already been taken in that 6 or 7 feet from the left.
|