View Single Post
  #54  
Old Posted Mar 2, 2012, 6:46 PM
dar124 dar124 is offline
Registered User
 
Join Date: Jan 2011
Location: Cleveland, OH
Posts: 158
Here's a FEB webcam update. Not too much noticeable progress since some of the last pics were posted.



http://www.flatseast.com/webcam.htm



It does look like the extra long steel pieces on the left of the webcam pic will be the "cut-out" area of the building. If that's the case then we've got another 5-6 levels for the elevator core for it to be topped out!!! Hard to believe that the steel structure will be double what it is now. Looks like this building will have some decent size to it.