  #61  
Old Posted Apr 25, 2021, 6:02 PM
jammer139 jammer139 is online now
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,787
Mechanical penthouse walls now poured. Just need to roof it and this 16s building is topped out.


Would expect CF to send the concrete crew downtown to Centro site.
Reply With Quote
     
     
  #62  
Old Posted Apr 30, 2021, 6:49 PM
jammer139 jammer139 is online now
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,787
Podium level exterior stone already being installed. All the windows are now in upto 14 floor.
Reply With Quote
     
     
  #63  
Old Posted Jun 13, 2021, 2:38 PM
jammer139 jammer139 is online now
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,787
Stone exterior for podium now installed. Nearly done installing the windows and balcony doors for the 15 and 16th floors.
Reply With Quote
     
     
  #64  
Old Posted Jun 21, 2021, 7:29 PM
jammer139 jammer139 is online now
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,787
Completed the 15th and 16th floor windows and balcony door installation. The cooling unit has also been installed on the roof. Should be weather tight now and interior rough in and finishing should progress over the coming months. Exterior concrete finishing should be starting soon.
Reply With Quote
     
     
  #65  
Old Posted Jul 7, 2021, 7:41 PM
jammer139 jammer139 is online now
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,787
Old Oaks has taken down the tower crane today.
Reply With Quote
     
     
  #66  
Old Posted Jul 18, 2021, 6:34 PM
jammer139 jammer139 is online now
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,787
Prepping for the landscaping and driveway, sidewalks now. Site cleanup is starting on the east and north sides. The south side still has the construction elevator and is being used to deliver materials.
Reply With Quote
     
     
  #67  
Old Posted Aug 11, 2021, 12:32 AM
jammer139 jammer139 is online now
Registered User
 
Join Date: Jun 2016
Location: London
Posts: 5,787
Walkways and curbs now poured. Fencing on the east side is now installed and some grading for topsoil and landscaping.
Reply With Quote
     
     
End
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > London > Projects & Construction Updates
Forum Jump



Forum Jump


All times are GMT. The time now is 2:39 PM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.