Completed the 15th and 16th floor windows and balcony door installation. The cooling unit has also been installed on the roof. Should be weather tight now and interior rough in and finishing should progress over the coming months. Exterior concrete finishing should be starting soon.
Prepping for the landscaping and driveway, sidewalks now. Site cleanup is starting on the east and north sides. The south side still has the construction elevator and is being used to deliver materials.