They have now poured the L1 floor slab to the SW corner and have also poured another section of ground floor slab along the south side. Forming now going up for the ground floor slab thru to the SW corner. Making progress with forming ground floor walls and posts in the SE corner where the tower will be. And have forming started for the 2nd floor slab in the NE corner. A lot of work left to finish the L1 foundation level on the NW corner of the pit. Not clear where the parking entrance and ramp will be located as they haven't got to that section as of yet.
|