HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation


Reply

 
Thread Tools Display Modes
     
     
  #321  
Old Posted Jan 23, 2024, 9:03 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 24,182
Quote:
Originally Posted by Uhuniau View Post
That's ambitious.
I wouldn't expect two minutes on opening day. Might be 5 or 10 initially, but if the tram is ultimately to Plateau, Aylmer and a conversion of the Rapibus, then we might need 2 minute frequency for a 9k capacity along the loop.
Reply With Quote
     
     
  #322  
Old Posted Jan 23, 2024, 10:16 PM
rocketphish's Avatar
rocketphish rocketphish is offline
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 12,440
Quote:
Originally Posted by roger1818 View Post
Agreed. A tram could easily use single track in the centre section, which is likely the strongest, leaving the cantilevered sections for active transportation.
And that's exactly what it was designed for... a train in the middle, and active horses on either side.



https://www.cbc.ca/news/canada/ottaw...tion-1.7090387
Reply With Quote
     
     
  #323  
Old Posted Jan 24, 2024, 12:11 AM
Uhuniau Uhuniau is offline
Registered User
 
Join Date: Jan 2010
Posts: 8,081
Bring back horse lanes!
__________________
___
Enjoy my taxes, Orleans (and Kanata?).
Reply With Quote
     
     
  #324  
Old Posted Jan 24, 2024, 1:07 AM
roger1818's Avatar
roger1818 roger1818 is offline
Registered User
 
Join Date: Feb 2016
Location: Stittsville, ON
Posts: 6,510
Quote:
Originally Posted by rocketphish View Post
And that's exactly what it was designed for... a train in the middle, and active horses on either side.



https://www.cbc.ca/news/canada/ottaw...tion-1.7090387
Almost, but not quite it was CPR trains in the centre and trams on the outside, but carriages and pedestrians were also allowed to use the outside. In that photo if you look carefully, you can actually see the tram tracks on the cantilevered section.
__________________
Pronouns: He/Him/His
Reply With Quote
     
     
  #325  
Old Posted Jan 24, 2024, 1:50 AM
rocketphish's Avatar
rocketphish rocketphish is offline
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 12,440
Quote:
Originally Posted by roger1818 View Post
Almost, but not quite it was CPR trains in the centre and trams on the outside, but carriages and pedestrians were also allowed to use the outside. In that photo if you look carefully, you can actually see the tram tracks on the cantilevered section.
I didn't say there wasn't a provision for trams and cyclists and pedestrians on the original bridge, I was merely providing evidence that your assertion that it could support a tram in the middle and active transportation on the sides is correct, as it did that and more (a train in the middle).

I'm sure that this has been posted before, but there's some great Interprovincial Bridge info here, including how it was tested, and the first accident on the bridge:
https://www.historicalsocietyottawa....exandra-bridge
Reply With Quote
     
     
  #326  
Old Posted Jan 24, 2024, 4:13 PM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 11,914
Heavy rail (CPR passenger trains) used the centre section of the bridge. Hull electric streetcars ran on the outside with regular traffic. Mind you, the streetcars of that era were pretty short, so nothing like modern articulated LRT.
Reply With Quote
     
     
  #327  
Old Posted Yesterday, 5:45 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 24,182
I was considering only posting this on Skyrise, but the level of engagement over there isn't nearly as high.

Here's a very interesting concept design for the new Alexandra Bridge. Unfortunately, this is not an official proposal, and I’m sure Government would never come up with anything nearly as innovative.




https://linktr.ee/atelierdesjardins
Reply With Quote
     
     
  #328  
Old Posted Yesterday, 6:24 PM
rocketphish's Avatar
rocketphish rocketphish is offline
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 12,440
It's a brilliant idea to extend an urban park right across the river. What would sink this plan, though, is that there isn't any automobile crossing included. If Ottawa had a surplus of vehicle crossings in the core, this would be fine, but alas we don't.

They have a survey available for those who want to comment.

Here are some larger images from the proposal:









Reply With Quote
     
     
  #329  
Old Posted Yesterday, 6:30 PM
SL123 SL123 is offline
Registered User
 
Join Date: Mar 2021
Posts: 1,396
Its definitely innovative but I'm not sure why you would have a MUP on both level of the bridges and no car at all tho. if you're going to remove cars from that crossing then you dont need a double deck bridge IMO
Reply With Quote
     
     
  #330  
Old Posted Yesterday, 6:37 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 24,182
Quote:
Originally Posted by rocketphish View Post
It's a brilliant idea to extend an urban park right across the river. What would sink this plan, though, is that there isn't any automobile crossing included. If Ottawa had a surplus of vehicle crossings in the core, this would be fine, but alas we don't.
Thanks for posting those images!

If the East end bridge was built, I think we could easily justify removing up to four car lanes from the core. That said, I still think removing cars from Alexandra is doable. It's closed much of the time, but that hasn’t resulted in traffic perceivably worse than usual.

Quote:
Originally Posted by SL123 View Post
Its definitely innovative but I'm not sure why you would have a MUP on both level of the bridges and no car at all tho. if you're going to remove cars from that crossing then you dont need a double deck bridge IMO
I think the lower level is to connect to the ByWard Market and "ground" level pathways, while the upper level is to connect to the Point and Major's Hill Park. It also increase the capacity of an already congested active corridor.
Reply With Quote
     
     
  #331  
Old Posted Yesterday, 6:40 PM
OTSkyline OTSkyline is offline
Registered User
 
Join Date: Jun 2012
Posts: 2,563
It's wishful thinking, but knowing that LRT or a streetcar isn't happening, not sure why this design couldn't be repurposed slightly to do general traffic lanes on lower level and active transportation on the second level. Would improve interprovincial link, help beautify and I love the link to the new Kiweki point (the current walk on the bridge next to the car lanes is not very pleasant).
Reply With Quote
     
     
  #332  
Old Posted Yesterday, 6:43 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 24,182


What the heck happened to PdV C?
Reply With Quote
     
     
  #333  
Old Posted Yesterday, 6:58 PM
Matt1 Matt1 is offline
Registered User
 
Join Date: Apr 2022
Posts: 30
Beautiful concept. But I'm sure someone would try to light the thing on fire. Covered bridges are prone to pyromaniacs. I suppose it would be the same for this bridge
Reply With Quote
     
     
  #334  
Old Posted Yesterday, 7:06 PM
VANRIDERFAN's Avatar
VANRIDERFAN VANRIDERFAN is offline
Registered User
 
Join Date: Jan 2007
Location: Regina
Posts: 5,192
Quote:
Originally Posted by J.OT13 View Post
Thanks for posting those images!

If the East end bridge was built, I think we could easily justify removing up to four car lanes from the core. That said, I still think removing cars from Alexandra is doable. It's closed much of the time, but that hasn’t resulted in traffic perceivably worse than usual.



I think the lower level is to connect to the ByWard Market and "ground" level pathways, while the upper level is to connect to the Point and Major's Hill Park. It also increase the capacity of an already congested active corridor.
I have not really heard many complaints that the bridge is now closed to traffic. So why not go with this conceptÉ
Reply With Quote
     
     
  #335  
Old Posted Today, 2:02 AM
kwoldtimer kwoldtimer is offline
Registered User
 
Join Date: Jan 2008
Location: La vraie capitale
Posts: 23,683
Nice enough concept, I suppose, but I'm hoping for something rather more grand.
Reply With Quote
     
     
End
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 6:54 PM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.