HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Global Projects & Construction > City Compilations


Reply

 
Thread Tools Display Modes
     
     
  #1  
Old Posted Dec 13, 2005, 7:11 AM
Comrade's Avatar
Comrade Comrade is online now
They all float down here
 
Join Date: Jan 2002
Location: Hair City, Utah
Posts: 9,546
SALT LAKE CITY | Development Thread

Ok, I've neglected this thread, but there really hasn't been much news to report. Now it appears Salt Lake is about to see some exciting growth downtown, so I thought I'd retool this thread.

Oh and there is no map (I know, I know!)

Possible new tallest

30+ stories
Unknown height (over 420 feet)
Groundbreaking unknown



Hamilton Partners Tower

21 stores
316 feet
Groundbreaking finally set for August





Unnamed Residential Tower

30-31 stories
Unknown height
Groundbreaking set for next year




City Creek Condominiums

20 stories
Unknown height
Groundbreaking set for possibly next year



Global Exchange Place

23 stories
300+ feet
Groundbreaking unknown



Vantage Tower

12 stories
100 or so feet
Groundbreaking either fall of '07 or early '08



Federal Courthouse

10 stories
100 or so feet
Groundbreaking unclear, design may change



Radi8 Condos

6 stories
Groundbreaking has begun, or will begin shortly



Metro Condominiums

7 stories
Currently under construction



Broadway Park Lofts

7 stories
Groundbreaking expected to start next year







Metro Park West

Groundbreaking could come next year




Last edited by Comrade; Aug 23, 2007 at 3:20 AM.
Reply With Quote
     
     
  #2  
Old Posted Dec 13, 2005, 7:17 AM
James Bond Agent 007's Avatar
James Bond Agent 007 James Bond Agent 007 is offline
Posh
 
Join Date: Aug 2003
Location: Kansas City, MISSOURI
Posts: 21,177
Yeah but that Wasatch Block thingy fell through, so who cares about the rest of this stuff?
__________________
"There's two kinds of men in the world. Those who have a crush on Linda Ronstadt, and those who never heard of her." - Willie Nelson
Reply With Quote
     
     
  #3  
Old Posted Jul 22, 2006, 7:10 AM
Xeelee's Avatar
Xeelee Xeelee is offline
Baryonic Lord
 
Join Date: Nov 2003
Location: Houston
Posts: 2,080
Interesting.
Reply With Quote
     
     
  #4  
Old Posted Mar 25, 2007, 3:39 AM
SLC Projects's Avatar
SLC Projects SLC Projects is offline
Bring out the cranes...
 
Join Date: Dec 2006
Location: Salt Lake City
Posts: 6,108
What a old thread. Salt Lake has a lot more going for it now. This needs to be updated.
I will have to get to work on this and update it.
__________________
1. "Wells Fargo Building" 24-stories 422 FT 1998
2. "LDS Church Office Building" 28-stories 420 FT 1973
3. "111 South Main" 24-stories 387 FT 2016
4. "99 West" 30-stories 375 FT 2011
5. "Key Bank Tower" 27-stories 351 FT 1976
Reply With Quote
     
     
  #5  
Old Posted Mar 26, 2007, 3:54 AM
SLC Projects's Avatar
SLC Projects SLC Projects is offline
Bring out the cranes...
 
Join Date: Dec 2006
Location: Salt Lake City
Posts: 6,108
Here's a short update of projects in salt lake city.


Let's add some highrises to the list...


City Creek Condo Tower 1.....26 stories






City Creek Condo Tower 2.....32 stories





City Creek Condo Tower 3.....10-12 stories




World Trade Center Utah.......25-28 stories





222 South Main Tower....21 stories





Cowboy Partners Tower....30+ stories





Frank Moss Courthouse Expansion Tower...10 stoires




Remodel of the Walker Tower....18 stories
Upgrading this office building into class A offices space.
__________________
1. "Wells Fargo Building" 24-stories 422 FT 1998
2. "LDS Church Office Building" 28-stories 420 FT 1973
3. "111 South Main" 24-stories 387 FT 2016
4. "99 West" 30-stories 375 FT 2011
5. "Key Bank Tower" 27-stories 351 FT 1976
Reply With Quote
     
     
  #6  
Old Posted Mar 30, 2007, 2:39 AM
SLC Projects's Avatar
SLC Projects SLC Projects is offline
Bring out the cranes...
 
Join Date: Dec 2006
Location: Salt Lake City
Posts: 6,108
The City Creek Center project in downtown salt lake city is underway. The Mall is coming down to make way for highrise Condo Towers, Outdoor retails and office space.

Demo of the Mall.
http://www.youtube.com/watch?v=MMs7S6EF04o
__________________
1. "Wells Fargo Building" 24-stories 422 FT 1998
2. "LDS Church Office Building" 28-stories 420 FT 1973
3. "111 South Main" 24-stories 387 FT 2016
4. "99 West" 30-stories 375 FT 2011
5. "Key Bank Tower" 27-stories 351 FT 1976
Reply With Quote
     
     
  #7  
Old Posted Apr 11, 2007, 1:27 AM
jeff@jsharrisgroup's Avatar
jeff@jsharrisgroup jeff@jsharrisgroup is offline
NewYorker@Heart
 
Join Date: Feb 2007
Location: Boise, Idaho
Posts: 2
Thumbs up You know your Sh**

You've got everything nice and concice, but it will take until 2015 to complete this. The 30-story Cowboy Partners Bldg is a "maybe," the "Utah World Trade Center" is a "lets talk this thing up..." Let's hope Salt Lake gets everything that's being talked about.

It sucks about the 600-foot building, the Zion Social Hall(http://www.emporis.com/en/wm/bu/?id=...akecity-ut-usa), The Eagle Gate Plaza (original plans were 39 stories), The Twin 40-Story Towers (to be built by Kashogi), The American Towers (why didn't they just build ONE BIG 52-story Bldg?). And so on and so forth.

I do love SLC, I just liken it to the Rodney Dangerfield of cities - No Respect!
Reply With Quote
     
     
  #8  
Old Posted Aug 23, 2007, 3:20 AM
Comrade's Avatar
Comrade Comrade is online now
They all float down here
 
Join Date: Jan 2002
Location: Hair City, Utah
Posts: 9,546
Ok, I updated it. A lot has changed since the original one.
Reply With Quote
     
     
  #9  
Old Posted Aug 23, 2007, 5:44 AM
Eigenwelt's Avatar
Eigenwelt Eigenwelt is offline
OG from the L.B.C.
 
Join Date: Jun 2003
Location: Brooklyn
Posts: 3,055
Where's the map?
__________________
Jonesing for a real cheesesteak.
Reply With Quote
     
     
  #10  
Old Posted Aug 24, 2007, 12:31 AM
Comrade's Avatar
Comrade Comrade is online now
They all float down here
 
Join Date: Jan 2002
Location: Hair City, Utah
Posts: 9,546
As I said in the original post, there is no map. That was from the old project lists and I haven't made one for this updated version.

Anyway, here are construction pics of the HP site:



Reply With Quote
     
     
  #11  
Old Posted Aug 29, 2007, 3:04 PM
delts145's Avatar
delts145 delts145 is offline
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 19,417
..................................

Central Metro - Upper West Project @ Jordan Valley Station - Phase I Completed


UPPER WEST is a modern, multifamily community being constructed in Jordan Valley Station, a 40-acre master-planned, transit-oriented development less than 20 minutes from downtown Salt Lake City in West Jordan, Utah.
Its ultra-sleek design offers luxury finishes coupled with extraordinary community amenities. The luxury resort-inspired Courtyard pool and spa are adjacent to relaxing indoor community areas. A covered deck on the rooftop
spans the corner of the top floor and is designed to offer year-round enjoyment. It features magnificent views of the Wasatch Mountains, intimate fire pit and gathering areas. This remarkable community allows residents to
stylishly live where their lives are.



Photo Gallery of Completed Project: https://www.upperwestliving.com/photogallery

Site on right, pre-construction. On left, recently completed 'Rooftops' apartments project.

https://bvdincorp.com/wp-content/upl...Station-10.jpg


https://bvdincorp.com/wp-content/upl...-Station-1.jpg


https://bvdincorp.com/wp-content/upl...-Station-5.jpg








Photo Gallery of Completed Project: https://www.upperwestliving.com/photogallery


.

Last edited by delts145; Apr 23, 2024 at 1:22 PM.
Reply With Quote
     
     
  #12  
Old Posted Nov 6, 2007, 5:38 AM
blazefirelight's Avatar
blazefirelight blazefirelight is offline
Registered User
 
Join Date: Oct 2007
Posts: 104
Somethin goin on

It's good to see that there's stuff going on in Salt Lake, as far as the skyline growth goes. But I think that much taller buildings need to be built. Buildings taller than 450 ft. Salt Lake isn't all that impressive compared to a lot of well-known cities in the country. And I think that if Salt Lake wants to become the "heart of the Intermountain Empire," we'll need to start impressing people.

We need a mix of quality AND quantity.
Reply With Quote
     
     
  #13  
Old Posted Nov 19, 2007, 5:03 AM
SLC Projects's Avatar
SLC Projects SLC Projects is offline
Bring out the cranes...
 
Join Date: Dec 2006
Location: Salt Lake City
Posts: 6,108
A list of new tower possibilities.
List of towers in Salt Lake City, Lehi, Pleasant Grove and Provo that we could see within the next 10 years or less.


1. Mystery Glass Tower 35-40 stories
2. Frank Ghery Lehi Hotel Tower 45-stories at 450 FT.
3. Wasatch Partner Tower 33-stories
4. Cowboy Partner Tower 1 or Social Hall Tower 40-stories at over 375 FT.
5 World Trade Center Utah South Tower 25-30 stories
6. Viper's 40-story Condominium Tower The tower Viperlord's uncle was talking about. 40-stories
7. City Creek Center Condominium Tower 1 32-stories
8. Market Station Tower 27-stories
9. 222 South Main 21-stories
10. 22-story Condominium Tower ( Note this might be the same as Number 11. )
11. Lehi Condominium Tower 1 around 20-25 stoires
12. Lehi Condominium Tower 2 around 20-25 stories
13. City Creek Center Condominium Tower 2 19-stories
14. World Trade Center Tower North around 10-15 stories
15. Cowboy Partners Tower 2 17-stories or shorter
16. Embassy Hotel in Pleasant Grove 14-stories
17. City Creek Center Condominium Tower 4 14-stories
18. RDA State Property Towers 180 FT around 13-stories?
19. Salt Lake City Federal Courthouse Tower 10-stories
20. Provo's Zions Bank Financial Center 10-stories
21. City Creek Center Condominium Tower 6 10-stories
22. City Creek Center Condominium Tower 7 10-stories
23. City Creek Condominium Towers on Main 8-stories
24. Sugarhouse Mix-use Towers 6-7 stories


I know there's more projects but I ran out of room.
__________________
1. "Wells Fargo Building" 24-stories 422 FT 1998
2. "LDS Church Office Building" 28-stories 420 FT 1973
3. "111 South Main" 24-stories 387 FT 2016
4. "99 West" 30-stories 375 FT 2011
5. "Key Bank Tower" 27-stories 351 FT 1976
Reply With Quote
     
     
  #14  
Old Posted Dec 5, 2007, 3:22 PM
delts145's Avatar
delts145 delts145 is offline
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 19,417
................................

[IMG]
Updates East Bench - Misc. - University of Utah


Health Sciences garage, roadway and connector



Construction of a new 1,400-car parking garage and the road realignment on North Medical Drive is underway. The garage, located between the IJ & Jeanné Wagner Jewish Community Center and the Kathryn F. Kirk Center for Comprehensive Cancer Care and Women’s Cancers, will feature a lowered roadway entrance and a pedestrian connector to University Hospital so people on foot can avoid the traffic on North Medical Drive. The road realignment will raise North Medical Drive, allowing for better access into the North Medical Garage and the new parking garage. Additionally, two new roundabouts will be added at the entrance to University Hospital and the entrance to the new parking garage to improve traffic flow.

June 18, 2023




Photos By Paniolo Man

.[/IMG]

Last edited by delts145; Mar 19, 2024 at 12:40 AM.
Reply With Quote
     
     
  #15  
Old Posted Dec 7, 2007, 4:55 PM
delts145's Avatar
delts145 delts145 is offline
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 19,417
......................................











Last edited by delts145; May 14, 2024 at 1:44 PM.
Reply With Quote
     
     
  #16  
Old Posted Dec 19, 2007, 3:55 PM
delts145's Avatar
delts145 delts145 is offline
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 19,417
......................

Last edited by delts145; Apr 14, 2024 at 3:20 PM.
Reply With Quote
     
     
  #17  
Old Posted Dec 20, 2007, 8:38 PM
LosAngelesBeauty's Avatar
LosAngelesBeauty LosAngelesBeauty is offline
Registered User
 
Join Date: May 2004
Location: Los Angeles
Posts: 6,610
Hopefully the natural scenery won't be completely obliderated by "urban" development.
__________________
DTLA Rising
Reply With Quote
     
     
  #18  
Old Posted Dec 22, 2007, 2:51 PM
delts145's Avatar
delts145 delts145 is offline
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 19,417
....................

The high-traffic corner near Sugar House Park that drew community attention last year over nixed plans for a Kum & Go gas station remains in play for development.

A Malad City, Idaho, company applied in November on behalf of the property’s owner to demolish the former Sizzler restaurant that has stood empty for years on the northwest corner of the park at 2111 S. 1300 East.

Records show the permit is nearing approval. Fencing has gone up around the 0.82-acre property and rigs are poised to help raze the iconic eatery and haul its guts off to the landfill. The empty building has seen incidents of trespassing, according to a real estate agent representing the owner, a family company in Salt Lake City called Romney Farr Properties.


The choice spot by the park just off Interstate 80 is considered one of the more commercially desirable locations in and around Sugar House’s rapidly growing central business district.

The site got re-marketed to other potential developers over the summer after the city planning commission vetoed plans in April for a Kum & Go convenience store and gas station there, citing environmental and traffic concerns. Few recent developments in what’s often dubbed Salt Lake City’s second downtown have drawn that much public opposition, with hundreds of residents weighing in.

The Iowa-based Kum & Go chain has since been bought by the parent company of Maverik, the Salt Lake City-based convenience store chain, but Kum & Go is still obligated to a 20-year lease it signed on the property adjacent to the popular park, according to broker Kip Paul of Cushman & Wakefield.

Maverik is said to have a new developer interested in building a hotel on the property, according to Paul. Attempts to reach officials with FJ Management, Maverik’s parent company, were not immediately successful.

The notion of returning the property to some kind of hospitality use has come up before. Past efforts, though, have hit challenges over a lack of available parking space, getting additional building height approved under the property’s existing zoning and the thorny prospect of obtaining a state-authorized liquor license in proximity to park grounds.

The planning commission’s 9-1 vote to reject Kum & Go’s application for a conditional use permit there also cited potential impacts on the park, air quality and secondary water supplies in nearby Parleys Creek.

Since then, city planners have also drafted a new set of minimum distances that newly built gas stations can be from rivers, streams and other bodies of water, as well as parks and open spaces.

The Sugar House Community Council, meanwhile, has seen several ideas for the property since the gas station was turned down, including the prospect of new apartments, but those options are severely limited, according one key member.

“You can’t build a luxury apartment building if you don’t have parking,” said Judi Short, chair of the council’s land use and zoning committee. Going underground for parking, she noted, is precluded by a nearby earthen dam.

A proposal to preserve the space through a land swap involving property closer to Highland High School fell through, Short said. The city has also sought to purchase the property, without success.

For now, the site’s future after the Sizzler goes remains a question mark.

.

Last edited by delts145; Mar 30, 2024 at 11:48 AM.
Reply With Quote
     
     
  #19  
Old Posted Jan 6, 2008, 6:36 PM
delts145's Avatar
delts145 delts145 is offline
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 19,417
...................................

Last edited by delts145; May 21, 2024 at 11:25 AM.
Reply With Quote
     
     
  #20  
Old Posted Jan 6, 2008, 6:53 PM
delts145's Avatar
delts145 delts145 is offline
Registered User
 
Join Date: Aug 2006
Location: Downtown Los Angeles
Posts: 19,417
..............................................Proceed to most recent pages for updates

Salt Lake City Mayor outlines big future for Main Street, families in Annual report


By Carter Williams for KSL.com - Full Article @ https://www.ksl.com/article/50861480...-annual-report

SALT LAKE CITY — Utah's capital is now more populated than it has ever been and its growth has no signs of slowing down anytime soon, something that may have all started with a nudge from the 2002 Winter Olympics and Paralympics.

So, with the prospect of a second Winter Olympics exactly 10 years away, Salt Lake City Mayor Erin Mendenhall says she believes the city is poised for another major boost. But her vision for the future of the city, which she outlined Tuesday evening in her annual State of the City address, goes beyond the next year or next decade...


"Our momentum is only growing, in reach and intensity," she said, speaking inside the Grand Lobby of the Eccles Theater on Main Street. "We are setting the stage for not just tomorrow, but for the next 10 years, 20 years and even 50 years."


Main Street by Jeffrey D. Allred

...Mendenhall's vision includes turning Main Street into a walkable promenade following four years of testing the Open Street program where the streets are temporarily closed off to cars. Those weekends, according to the city, generated an impact of about $53 million during 116 collective days over the past four years, while downtown sales during the first three Open Streets events jumped by an average of 19% compared to 2019...

...The project is one of the few things planned for downtown, which is on pace to double in population in the coming years. That includes more multifamily and single-unit projects that aim to mold downtown into the community it was before families began fleeing into the suburbs in the 1960s.

Meanwhile, Salt Lake City leaders intend to keep downtown Salt Lake City at the forefront of commerce, finance, faith, culture and sport across the region. Dee Brewer, executive director of the Salt Lake City Downtown Alliance, called these all "major drivers in our economy."

"The downtown social economy is thriving and opportunities to build on this momentum are multiplying with active efforts to secure the Winter Olympic Games, Major League Baseball and the National Hockey League teams," he said...Note: Since the writing of this article the NHL will be locating downtown Salt Lake City this upcoming season. In addition, a major entertainment district surrounding the remake of the Delta Center will begin in earnest.)...


...A few other projects were brought up in Mendenhall's 50-minute speech:

The mayor said she hopes the Green Loop, a 5-mile park space circling the downtown, will be completed in time for the 2034 Winter Olympics, even if she believes her administration "won't see the opening."
The city is developing a five-year "action plan" to continue to conserve water, including changes to the city's top water users to improve water efficiency. A report is expected to be released "in the coming days" that will outline ways to better conserve water at city-owned facilities.
Salt Lake City expects to finalize a plan to send 13 billion gallons of reclaimed water to the struggling Great Salt Lake every year, fulfilling a goal the mayor called for in her speech last year.
The city will launch this year's e-bike and landscaping equipment exchange programs in the early summer.
While the event took place downtown, Mendenhall also hopes the momentum at the heart of the city carries into other neighborhoods. The mayor also outlined goals for other parts of the city during her speech, including the opening of the first phase of Glendale Regional Park later this year...


Now under construction, Glendale Regional Park in January. The first phase of the park is expected to open this year. (Photo: Jeffrey D. Allred, Deseret News)

Full Article @ https://www.ksl.com/article/50861480...-annual-report.



From South to North, a few of the recent additions to Main Steet's continuing buildup.


650 South Main

Developed by the Patrinley Group, 650 Main is a new 10-story, Class A office building on Salt Lake City’s growing south side. HOK designed the building to offer an amenity-rich experience tailored to meet the demands of today’s workforce. With its prime downtown location and unparalleled offerings, 650 Main is a unique workplace destination.

The building’s dynamic design captures the attention of visitors approaching from different directions. The Main Street facade has a clean and transparent look that encourages interactions with street-side activities. As people move east along 600 South, the structure transitions from a more expansive base to a sleeker tower, featuring a striking metal panel grid that stands out against the glazing. The building’s massing is carefully composed, with metal panels and alternative glass systems adding texture and intrigue...

...As a LEED Gold-certified building, 650 Main sets an excellent standard for health and sustainability. Large, open floor plates and floor-to-ceiling glass maximize daylight and panoramic views of the surrounding mountains and skyline. Outdoor terraces on the fifth and ninth floors offer employees spaces to recharge. The HVAC system delivers 30% more air ventilation than local codes require, further enhancing the building’s environmental performance.

650 Main’s ground floor is a bustling hub of activity, with a variety of retail and restaurants combining with Wi-Fi-enabled outdoor gathering areas to give tenants alternative “third places” to work or socialize.


https://www.hok.com/projects/view/650-main/



6th & Main

Directly East and across the street from 650 S. Main is 6th & Main, a mixed-use development sitting at the gateway intersection of 600 South and Main Street in downtown Salt Lake City. It consists of 175 units and 10,100 sf of retail within an 8-story type III over type I structure. Residential amenities include a street-level lounge, co-working business center, fitness center, pool, spa, and an indoor/outdoor roof terrace with sweeping views of Downtown Salt Lake City and beyond.




New 6th South TRAX Station
Sandwiched in between the two new Main St. developments of 650 S. and 6th & Main is the new 6th South TRAX light rail station.

Trains come in and exit a new Utah Transit Authority TRAX station at 600 S. Main Street in Salt Lake City on Tuesday.
(Photo: Scott G Winterton, Deseret News)







At the top of Main St., Downtown rooftop gardens continue to mature on the 21,000-seat Conference Center.

Photo by Jeffrey D. Allred @ https://www.thechurchnews.com/living...rs-activities/


[/CENTER]
.

Last edited by delts145; May 22, 2024 at 2:18 PM.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Global Projects & Construction > City Compilations
Forum Jump



Forum Jump


All times are GMT. The time now is 3:12 AM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.