Thanks to NYguy for the photos!
That is MASSIVE looking steel on the 33rd st side, so I assume that is really part of the 30 HY foundations. Looking NE
NYguy
It also looks like they've reached the 33rd street retaining wall (the gray concrete wall on the left, center). So I assume they'll be able to DRIVE equipment onto the platform from 33rd street in the next few months.
Looking NE:
NYguy
And here's a snip froma 3+ week old hardcoreshutterbug photo that gives an overhead context to NYguy's photos.
12.20.2014 looking NE:
Snip from hardcoreshutterbug's
https://www.flickr.com/photos/hardco...g/15658083843/