Old Posted Sep 27, 2017, 6:21 AM
KevinFromTexas's Avatar
KevinFromTexas KevinFromTexas is offline
Duck and covfefe
 
Join Date: Jul 2001
Location: stuck in the middle with you
Posts: 44,833
In a sort of abstract way, the vertical lines of the entrance resemble curtains surrounding a stage.
__________________
it's just a jump to the left and then a step to the right.
Reply With Quote
     
     
  #102  
Old Posted Nov 20, 2017, 12:46 PM
SkyPie's Avatar
SkyPie SkyPie is offline
Registered User
 
Join Date: Mar 2014
Posts: 235
I saw a countdown clock last night for what I presume is demolition of the building. It was placed over a sign that said "This structure erected in 1927 - to be demolished 2017". The countdown clock had just under six days left.
Reply With Quote
     
     
  #103  
Old Posted Nov 20, 2017, 3:56 PM
The ATX's Avatar
The ATX The ATX is offline
<Here
 
Join Date: May 2006
Location: 6EQUJ5
Posts: 5,718
The site is/was an appropriately name art venue called "The Demo Gallery". They lasted longer than they originally expected. This would explain why there were permits being filed to fix up the building at the same time permits were being filed to demo it for The Avenue. Mystery solved.

http://almostrealthings.com/2016/05/26/co-lab-projects/

From the link:
__________________
Austin on Urban Planet:
http://www.urbanplanet.org/forums/forum/215-austin/
Reply With Quote
     
     
  #104  
Old Posted Nov 20, 2017, 4:07 PM
Geckos_Rule's Avatar
Geckos_Rule Geckos_Rule is offline
Registered User
 
Join Date: Feb 2016
Location: Austin
Posts: 168
Quote:
Originally Posted by The ATX View Post
The site is/was an appropriately name art venue called "The Demo Gallery". They lasted longer than they originally expected. This would explain why there were permits being filed to fix up the building at the same time permits were being filed to demo it for The Avenue. Mystery solved.

http://almostrealthings.com/2016/05/26/co-lab-projects/

From the link:
Thats pretty cool. Although I'm excited for demolition and for construction to begin. I think this building is really great, and can't get here fast enough. Plus it doesn't take up an entire city block (a la Fairmont)!
Reply With Quote
     
     
  #105  
Old Posted Nov 20, 2017, 5:47 PM
freerover freerover is offline
Registered User
 
Join Date: Nov 2017
Posts: 157
It's interesting that there are windows on the south wide of the building. I guess they have assurances that the state and paramount theaters will never be torn down and re-developed into high-rises which makes sense.
Reply With Quote
     
     
  #106  
Old Posted Nov 21, 2017, 1:41 AM
427MM's Avatar
427MM 427MM is offline
Love Austin
 
Join Date: Sep 2001
Location: Austin
Posts: 738
Over 300' tall and ~43' wide--bring it!! I'm hearing it will break in Q1 of '18--can't come fast enough.
__________________
Get involved in CodeNEXT! Participate in your neighborhood meetings. Resist the politics of exclusion.
Reply With Quote
     
     
  #107  
Old Posted Dec 1, 2017, 5:30 PM
The ATX's Avatar
The ATX The ATX is offline
<Here
 
Join Date: May 2006
Location: 6EQUJ5
Posts: 5,718
I don't get the feeling that this one is going to start any time soon. Four "commercial remodel" permits for 721 Congress were approved today. They are all for "Add 3 hour Separation Wall." I have no idea WTH that is. But it doesn't sound like it's related to a demolition.

Here's one of them:
https://abc.austintexas.gov/web/perm...ertyrsn=201278
__________________
Austin on Urban Planet:
http://www.urbanplanet.org/forums/forum/215-austin/
Reply With Quote
     
     
  #108  
Old Posted Dec 1, 2017, 5:48 PM
AusTxDevelopment AusTxDevelopment is offline
Registered User
 
Join Date: Jun 2012
Posts: 500
Quote:
Originally Posted by The ATX View Post
I don't get the feeling that this one is going to start any time soon. Four "commercial remodel" permits for 721 Congress were approved today. They are all for "Add 3 hour Separation Wall." I have no idea WTH that is. But it doesn't sound like it's related to a demolition.

Here's one of them:
https://abc.austintexas.gov/web/perm...ertyrsn=201278
3 hour separation walls are for fireproofing. It effectively means that the wall will not burn through in less than 3 hours during a typical fire event. Why would you fireproof a wall you were going to demolish? Unless this wall will be shared with the neighboring building and they are reinforcing it prior to construction. Can't tell without seeing the plans.
Reply With Quote
     
     
  #109  
Old Posted Dec 1, 2017, 6:59 PM
MichaelB MichaelB is offline
Registered User
 
Join Date: May 2006
Location: North edge of Downtown
Posts: 2,733
There are Models on the north side of the building. Something to do with that?
I really like this project and hope it happens.
Reply With Quote
     
     
  #110  
Old Posted Dec 1, 2017, 7:00 PM
Jdawgboy's Avatar
Jdawgboy Jdawgboy is offline
Representing the ATX!!!
 
Join Date: Jan 2003
Location: Austin
Posts: 4,077
I'm assuming Its for the wall along the State Theater.
__________________
"GOOD TIMES!!!" Jerri Blank (Strangers With Candy)
Reply With Quote
     
     
  #111  
Old Posted Dec 15, 2017, 12:24 AM
SkyPie's Avatar
SkyPie SkyPie is offline
Registered User
 
Join Date: Mar 2014
Posts: 235
I noticed they reset the demo countdown clock and it now says 17 days plus a few hours until demolition.
Reply With Quote
     
     
  #112  
Old Posted Dec 15, 2017, 1:04 AM
The ATX's Avatar
The ATX The ATX is offline
<Here
 
Join Date: May 2006
Location: 6EQUJ5
Posts: 5,718
According to the Demo Gallery's social media comments, their last event before Demo ended Thanksgiving weekend (11/25).
__________________
Austin on Urban Planet:
http://www.urbanplanet.org/forums/forum/215-austin/
Reply With Quote
     
     
  #113  
Old Posted Dec 15, 2017, 3:48 AM
The ATX's Avatar
The ATX The ATX is offline
<Here
 
Join Date: May 2006
Location: 6EQUJ5
Posts: 5,718
Quote:
Originally Posted by SkyPie View Post
I noticed they reset the demo countdown clock and it now says 17 days plus a few hours until demolition.
That would be a Sunday and New Years Eve. We'll see about that. But I never noticed until recently based on the permit filings that Nelsen is also the developer and not just the architect. So I suspect the office space in the project is for them. Their current office is just two blocks down the street.
__________________
Austin on Urban Planet:
http://www.urbanplanet.org/forums/forum/215-austin/
Reply With Quote
     
     
  #114  
Old Posted Dec 18, 2017, 9:32 PM
The ATX's Avatar
The ATX The ATX is offline
<Here
 
Join Date: May 2006
Location: 6EQUJ5
Posts: 5,718
__________________
Austin on Urban Planet:
http://www.urbanplanet.org/forums/forum/215-austin/
Reply With Quote
     
     
End
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > United States > Texas & Southcentral > Austin
Forum Jump


Thread Tools
Display Modes

Forum Jump


All times are GMT. The time now is 9:28 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2018, vBulletin Solutions, Inc.