12/18/2017

Interior demo is definitely underway. There is some heavier machinery on site now. Sorry my picture is rather crumby.

Reply With Quote
     
     
  #102  
Old Posted Dec 20, 2017, 3:14 PM
ebuilder ebuilder is offline
Registered User
 
Join Date: Dec 2017
Posts: 49
What is taking so long to bring this garage down???
Reply With Quote
     
     
  #103  
Old Posted Dec 20, 2017, 3:46 PM
City Wide City Wide is offline
Registered User
 
Join Date: Aug 2014
Posts: 740
does this site include the taller brick faced garage that's closer to 16th St. or does only take in the lower concrete structure?

You can't rush careful craftsman doing careful work taking apart a important historical building

Last edited by City Wide; Dec 22, 2017 at 2:43 PM.
Reply With Quote
     
     
  #104  
Old Posted Dec 22, 2017, 1:38 PM
shadowbat2 shadowbat2 is online now
Registered User
 
Join Date: Sep 2013
Posts: 852
....and it's begun:
Little Pete's garage by shad obat, on Flickr

Little Pete's garage by shad obat, on Flickr

Little Pete's garage by shad obat, on Flickr
Reply With Quote
     
     
  #105  
Old Posted Dec 22, 2017, 1:47 PM
shadowbat2 shadowbat2 is online now
Registered User
 
Join Date: Sep 2013
Posts: 852
Quote:
Originally Posted by City Wide View Post
does this site include the taller brick faced garage that's closer to 16th St. or does only take in the lower concrete structure?
I'm curious about this as well. Renderings suggested that the white garage was the only thing being replaced and the brick garage shown intact behind it (see posts 73 and 78).

However both structures seem to be part of the same property (they are actually connected inside by ramps/doors), which would lead me to believe they might be demolished at once.

Also the brick garage was slapped with a violation notice by L&I back on October 30th citing "falling masonry" and giving the owners 30 days to repair or demolish. The owners have put black netting over some sections of the building to comply....
Reply With Quote
     
     
  #106  
Old Posted Today, 3:41 AM
shadowbat2 shadowbat2 is online now
Registered User
 
Join Date: Sep 2013
Posts: 852
Reply With Quote
     
     
End
 
 
Reply

Go Back   SkyscraperPage Forum > Global Projects & Construction > Proposals
Forum Jump


Thread Tools
Display Modes

Forum Jump


All times are GMT. The time now is 6:18 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2018, vBulletin Solutions, Inc.