Looks like these puppies are on hold. No movement since site prep happened in the winter. Might be stuck in litigation still, not sure though.
__________________
Strong & free
'My friends, love is better than anger. Hope is better than fear. Optimism is better than despair. So let us be loving, hopeful and optimistic. And we’ll change the world.' — Jack Layton
Lots of utility work going on. Excavators on site.
__________________
Strong & free
'My friends, love is better than anger. Hope is better than fear. Optimism is better than despair. So let us be loving, hopeful and optimistic. And we’ll change the world.' — Jack Layton
Is this project going to be two or three towers? I know 3 where planned and thought the developer would scrap one of the towers and add floors to the remaining two.
Sorry to break your heart Tallbob, but there are still three towers with no height changes. Looks like the third tower will built last. They have just started with the pilings on this section.