  #3501  
Old Posted Aug 20, 2017, 10:46 PM
Submariner's Avatar
Submariner Submariner is online now
Registered User
 
Join Date: Mar 2013
Posts: 1,149


Jesus Christ...that coating is absolutely horrendous.
Reply With Quote
     
     
  #3502  
Old Posted Aug 31, 2017, 10:33 PM
chris08876's Avatar
chris08876 chris08876 is online now
Registered User
 
Join Date: Jul 2013
Location: New Jersey - Somerset County
Posts: 23,026
Construction Begins Underneath The Ronald O. Perelman Performing Arts Center, World Trade Center





Quote:
The photos come from Earthcam’s World Trade Center station, which has offered excellent updates on the gradual transformation of the site. Steel plating began arriving a few weeks ago, and construction has now begun, with the first columns rising for the Vehicle Security Center.

The diagram of the site shows the location of the VSC in relation to the Performing Arts Center, and makes obvious why the former must be finished before the latter can start to rise.

Joshua Prince-Ramus of REX is designing the project, which will be the crowning cultural centerpiece of the new World Trade Center complex. There will be three theaters within the project, each containing seating for 499, 250, and 99 people, respectively.

Completion is expected by 2020, and the actual Performing Arts Center should begin construction in another year or so.
========================
NYY
Reply With Quote
     
     
  #3503  
Old Posted Nov 1, 2017, 2:08 PM
eltodesukane eltodesukane is offline
Registered User
 
Join Date: Dec 2011
Posts: 538
Still nothing happening here.
Still a hole in the ground, 16 years after 9/11.
Reply With Quote
     
     
  #3504  
Old Posted Nov 1, 2017, 2:41 PM
mindbender mindbender is offline
Registered User
 
Join Date: Apr 2006
Posts: 31
Nothing happening... except for the new steel that's been added (admittedly slowly) over the last couple months.
Reply With Quote
     
     
  #3505  
Old Posted Nov 1, 2017, 2:54 PM
Streamliner's Avatar
Streamliner Streamliner is offline
Frequent Lurker
 
Join Date: Nov 2001
Location: California
Posts: 293
Quote:
Originally Posted by eltodesukane View Post
Still nothing happening here.
Still a hole in the ground, 16 years after 9/11.
That's not totally fair, I mean it was a PATH station entrance until last year when they demo'd it, right?
Reply With Quote
     
     
  #3506  
Old Posted Nov 1, 2017, 2:57 PM
JSsocal JSsocal is online now
Registered User
 
Join Date: Dec 2008
Posts: 617
If you're keeping score last month they finally finished the entry on the east side of 1 wtc. (Still incomplete after all these years). For the last few years there's been exposed steel and insulation where that portal should have been. Hopefully this means they've started to make the underground connections on the vsc.

As a side note on 1wtc (asking here since these forums get more traffic)- does anyone know what's going on with the new openings at the top of 1 wtc- on each of the cardinal elevations there's 2 removed windows near the top, not sure if these are for new mechanical vents or are temporary but they detract from the look of the building.
Reply With Quote
     
     
  #3507  
Old Posted Nov 1, 2017, 3:47 PM
CIA CIA is offline
Registered User
 
Join Date: Jan 2014
Posts: 1,578
Quote:
Originally Posted by Streamliner View Post
That's not totally fair, I mean it was a PATH station entrance until last year when they demo'd it, right?
Correct.
Reply With Quote
     
     
  #3508  
Old Posted Nov 2, 2017, 11:04 PM
Enigmatism415's Avatar
Enigmatism415 Enigmatism415 is offline
Registered User
 
Join Date: Jul 2012
Posts: 210
Quote:
Originally Posted by JSsocal View Post
If you're keeping score last month they finally finished the entry on the east side of 1 wtc. (Still incomplete after all these years). For the last few years there's been exposed steel and insulation where that portal should have been. Hopefully this means they've started to make the underground connections on the vsc.
Well, as few seem to realise, the VSC is what is being built right now, not the PAC. The PAC will sit atop the VSC just as 7WTC sits atop a ConEd station, just as the original one had.

Quote:
Originally Posted by JSsocal View Post
As a side note on 1wtc (asking here since these forums get more traffic)- does anyone know what's going on with the new openings at the top of 1 wtc- on each of the cardinal elevations there's 2 removed windows near the top, not sure if these are for new mechanical vents or are temporary but they detract from the look of the building.
The permanent window-washing mechanisms are broken, so rather than allow dirt to accumulate on the windows and incur the wrath of Condé Nast, they knocked out two windows on each side from which they're hanging the window-washing platforms.
Reply With Quote
     
     
  #3509  
Old Posted Dec 22, 2017, 2:29 PM
eltodesukane eltodesukane is offline
Registered User
 
Join Date: Dec 2011
Posts: 538
Work Appears To Stall for World Trade Center’s Ronald O. Perelman Performing Arts Center
By: Nikolai Fedak 8:00 am on December 22, 2017

Back in August, YIMBY reported on apparent progress on the site of the Vehicle Security Center and future Ronald O. Perelman Performing Arts Center, on the site of the old temporary PATH Station.
Unfortunately, while steel began to rise as summer turned to fall and reached street-level by November, December has seemingly brought a freeze to the pace of progress.
https://newyorkyimby.com/2017/12/wor...ts-center.html
Reply With Quote
     
     
  #3510  
Old Posted Dec 22, 2017, 4:40 PM
NOPA NOPA is offline
Registered User
 
Join Date: May 2010
Location: New York City
Posts: 283
I believe that Conde Nast did sue Durst over window washing fees. The mechanisms broke in 2014 and wont be fixed until 2018. But hey what's one more failure after everything else Durst has done wrong?
Reply With Quote
     
     
  #3511  
Old Posted Dec 31, 2017, 10:21 PM
BStyles BStyles is offline
Registered User
 
Join Date: Jul 2009
Posts: 556
Quote:
Originally Posted by eltodesukane View Post
Work Appears To Stall for World Trade Center’s Ronald O. Perelman Performing Arts Center
By: Nikolai Fedak 8:00 am on December 22, 2017

Back in August, YIMBY reported on apparent progress on the site of the Vehicle Security Center and future Ronald O. Perelman Performing Arts Center, on the site of the old temporary PATH Station.
Unfortunately, while steel began to rise as summer turned to fall and reached street-level by November, December has seemingly brought a freeze to the pace of progress.
https://newyorkyimby.com/2017/12/wor...ts-center.html
You made a lot of weather puns. I'm willing to bet it's because of that.
Reply With Quote
     
     
  #3512  
Old Posted Jan 9, 2018, 5:59 PM
Enigmatism415's Avatar
Enigmatism415 Enigmatism415 is offline
Registered User
 
Join Date: Jul 2012
Posts: 210
__________________
"THIS IS WHO WE ARE Optimistic. Courageous. Undaunted. This is the World Trade Center—a pioneering spirit unchanged since 1972."

Last edited by Enigmatism415; Jan 16, 2018 at 10:18 PM.
Reply With Quote
     
     
End
 
 
Reply

Go Back   SkyscraperPage Forum > Global Projects & Construction > General Development
Forum Jump


Thread Tools
Display Modes

Forum Jump


All times are GMT. The time now is 12:16 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2018, vBulletin Solutions, Inc.