Quote:
Originally Posted by WarrenC12
In a regular world that should be do-able, but I agree with the pace of typical projects that seems optimistic.
For those freaking out, this project has been well publicized for a long time.
|
I bet many people who don't live in Vancouver had no idea it was happening and only found out when they came downtown for a game or show.
Living in Vancouver I was aware of the project but not that they were going to demo a section of the bridge. Or that they would block the left turn lane of Seymour with a bus bulge at Davie.
Speaking of the bus, it is weird that they come down the Seymour off ramp in the right lane and then have to cut over in heavy traffic over to the left lane to turn onto Davie. Catenary issue?
Mid-day last week I saw a #14 going down Seymour near Nelson. It was in service so was the driver must have been confused about having to go down Granville. Why not just have the bus go down Seymour all the time instead of just weekends until the bridge is rebuilt?