I guess in essence this will be a pretty standard looking building on most sides, except the sides bounding the space where the King Eddy and 4th street are which will look pretty cool.
__________________
Concerned about protecting Calgary's built heritage?
www.CalgaryHeritage.org
News - Heritage Watch - Forums
Reply With Quote
     
     
  #62  
Old Posted Jul 16, 2014, 6:08 PM
CorporateWhore's Avatar
CorporateWhore CorporateWhore is offline
Registered User
 
Join Date: Jul 2001
Location: Purgatory
Posts: 4,685
It will definitely come down to the tiles, which we've pretty much figured all along.

The Museum of Art and Design in NYC that Allied worked also has some terra cotta tiles, so I'm wondering if they will be similar.







I've never been a huge fan of they way MAD turned out (although in fairness, it was more of a re-clad of an existing building...although the old was prehaps cooler), which is why I've had reservations about Allied. But I have liked the improvement of the project (or perhaps just the renderings!) as the project has moved forward, so I have my fingers crossed.

Overall though, I think it brings a new aesthetic to Calgary design wise, which I really like. There's nothing tacked-on here, just clean lines and gentle curves. But clean understated design always needs high-quality materials to pull it off.
Reply With Quote
     
     
  #63  
Old Posted Jul 21, 2014, 4:43 PM
Spring2008 Spring2008 is offline
BANNED
 
Join Date: Apr 2008
Location: Lower Mount Royal, Calgary
Posts: 5,147
Quote:

Calgary's National Music Centre begins to take shape in revitalized East Village
By Michael Platt ,Calgary Sun


Study the inside of a fine old piano or guitar, and you’ll discover an instrument painstakingly put together, each unique piece requiring the coaxing of a true craftsmen to get just the right fit.

Expand that meticulous labour to around 160,000 sq.-ft., and you get a pretty good idea what’s happening over on 9 Ave. and 4 St. S.E., where a building such that Calgary has never seen is starting to dominate the East Village skyline.

When it opens in 2016, this will be the home of the National Music Centre, but as an architectural achievement for this city, it represents far more than that.

“You couldn’t have built this ten years ago,” said Gary Duke, project manager for the $168-million landmark-in-the-making.

“You couldn’t have designed this without the capability of 3-D modelling programs we have today.”

Standing five-storeys tall and bridging two East Village blocks, the interior of the National Music Centre at times evokes the sandy cliffs at Petra, where every turn offers a keyhole glimpse of something new.

Or it will. Right now, the National Music Centre looks more like a giant Meccano set, half complete and with a parking lot full of numbered parts waiting to be assembled.

Hidden under his hard hat and safety glasses, it’s hard to tell if Duke is actually giddy about what he calls his once-in-a-lifetime project, but this is clearly a man very excited to be getting up for work each morning.

All around him, it’s a cathedral of construction: steel girders blending into sweeping concrete slabs, and not a simple corner or easily fabricated surface in sight.

This is a job that has taken the tradesmen of Calgary to their limit — and every wall, slab of tile and internal pipe has to be measured and re-measured to ensure it fits perfectly, without clashing with the centre’s amorphous blueprint.

It pushes every construction boundary, and when it’s done, the National Music Centre, designed by Brad Cloepfil of Portland’s Allied Works, will have lifted Calgary to a new standard of architecture.

Like New York’s Guggenheim or Sydney’s Opera House, the National Music Centre is a building that will be just as admired as the art it showcases, and with more than 2,000 musical artifacts and ongoing live performances, that’s really saying something.

“Why not Calgary? It’s our turn,” said Duke, listing other Canadian cities with iconic buildings for national culture, including Ottawa and Toronto.

The state-of-the-art facility, where humidity and temperature control are paramount, will feature both exhibition and performance spaces, as well as the Canadian Music Hall of Fame and the Canadian Country Music Hall of Fame.

Cloepfil has described his design as a series of intertwining towers, and the building spans 4 St. S.E. to include the historic King Edward Hotel, which will be rebuilt with original brick and interior fixtures, and once again be a live music club serving local blues fans.

The centre’s distinctive roof will support giant bowls containing vast skylights, and Plus-65 crossing linking the two sides of the centre will serve as a gateway to the revitalized East Village, where buildings like this and the new Central Library promise to redefine Calgary in future postcards.

Across from the King Eddy, the galleries of the main building all focus on a 300-seat performance venue but the entire building is designed for live music to echo through every alcove and staircase.

“Around every corner there will be a different sound, pulling you into that space,” said Mary Kapusta, public relations manager for the National Music Centre.

michael.platt@sunmedia.ca



Precious Sound: Some treasures of the National Music Centre

1: Rolling Stones Mobile: An entire recording studio console contained in the back of British lorry, this is the truck where the Stones recorded Exile on Main Street, before loaning it to other acts like Led Zeppelin, Deep Purple, The Who and Bob Marley.

The NMC plans to install the restored mobile behind the King Eddy, allowing modern bands to record live, via the same analog equipment responsible for some of the greatest records ever made.

2: TONTO: Otherwise known as The Original New Timbral Orchestra, TONTO is a giant analog synthesizer, and one of the first “capable of producing many tone colours with different voices simultaneously.” Considered the most cutting edge instrument of its time, TONTO was used by Stevie Wonder, Quincy Jones, Randy Newman and Bobby Womack, among others.

3: Elton John’s piano: Sure, Elton has owned a few by now, but this is the early piano on which he and Bernie Taupin composed hundreds of songs, including John’s first four albums. Otherwise a basic white instrument, this is one of those artifacts made priceless by famous fingers.

4: Canadian Country Music Hall of Fame collection: More than 1,300 items connected to Canadian country stars, including Hank Snow’s glittering stage suits and Sylvia Tyson’s autoharp.

5: Studio One: “NMC’s goal is to create a natural, comfortable environment in which artists will enjoy creating new music. It will feature analog equipment from NMC’s collection from the 1960s to the 1980s, and modern tools, offering the best of both worlds,” reads the NMC’s own description of the future recording studio. In short, a place for musicians to play, making Calgary a destination for creative talent.
http://www.calgarysun.com/2014/07/19...d-east-village
Reply With Quote
     
     
  #64  
Old Posted Jul 21, 2014, 4:48 PM
Spring2008 Spring2008 is offline
BANNED
 
Join Date: Apr 2008
Location: Lower Mount Royal, Calgary
Posts: 5,147
Reply With Quote
     
     
  #65  
Old Posted Jul 23, 2014, 5:04 AM
Deepstar's Avatar
Deepstar Deepstar is offline
Registered User
 
Join Date: Mar 2007
Location: Canada
Posts: 6,291
NMC is looking great.
Reply With Quote
     
     
  #66  
Old Posted Aug 24, 2014, 3:11 AM
Design-mind's Avatar
Design-mind Design-mind is offline
Registered User
 
Join Date: Oct 2012
Posts: 4,653
National Music Centre update, along with King Eddy.



Reply With Quote
     
     
  #67  
Old Posted Aug 24, 2014, 5:46 AM
Chadillaccc's Avatar
Chadillaccc Chadillaccc is offline
ARTchitecture
 
Join Date: Feb 2011
Location: Cala Ghearraidh
Posts: 22,842
Is there any steel up on the west side at all yet?
__________________
Strong & Free

Mohkínstsis — 1.6 million people at the Foothills of the Rocky Mountains, 400 high-rises, a 300-metre SE to NW climb, over 1000 kilometres of pathways, with 20% of the urban area as parkland.
Reply With Quote
     
     
  #68  
Old Posted Aug 24, 2014, 6:01 AM
geotag277 geotag277 is offline
Registered User
 
Join Date: Nov 2013
Posts: 5,091
Can't wait to see how this one finally turns out. It will either be just OK, or awesome.
Reply With Quote
     
     
  #69  
Old Posted Aug 24, 2014, 7:05 PM
Design-mind's Avatar
Design-mind Design-mind is offline
Registered User
 
Join Date: Oct 2012
Posts: 4,653
Quote:
Originally Posted by Chadillaccc View Post
Is there any steel up on the west side at all yet?
No steel as of yesterday.
Reply With Quote
     
     
  #70  
Old Posted Aug 25, 2014, 5:17 PM
Chadillaccc's Avatar
Chadillaccc Chadillaccc is offline
ARTchitecture
 
Join Date: Feb 2011
Location: Cala Ghearraidh
Posts: 22,842
Darn! It's taking quite a while for that section of the project, while the other side has seemingly been going at warp 7!

It is a good sign that they are closing 4th Street though, obviously they plan on beginning erecting the steel on that side very soon, or else they wouldn't be making major (sorta... ish) traffic disruptions for the bridge section already.
__________________
Strong & Free

Mohkínstsis — 1.6 million people at the Foothills of the Rocky Mountains, 400 high-rises, a 300-metre SE to NW climb, over 1000 kilometres of pathways, with 20% of the urban area as parkland.
Reply With Quote
     
     
  #71  
Old Posted Aug 29, 2014, 2:48 PM
Chadillaccc's Avatar
Chadillaccc Chadillaccc is offline
ARTchitecture
 
Join Date: Feb 2011
Location: Cala Ghearraidh
Posts: 22,842
The interior structure of the NMC looks fascinating. I am hopeful that it will be a wonderful architectural experiences both outside and inside


Here are some updates...


Closeup by Chadillaccc, on Flickr

NMC West by Chadillaccc, on Flickr

NMC Bridge Prep by Chadillaccc, on Flickr
__________________
Strong & Free

Mohkínstsis — 1.6 million people at the Foothills of the Rocky Mountains, 400 high-rises, a 300-metre SE to NW climb, over 1000 kilometres of pathways, with 20% of the urban area as parkland.
Reply With Quote
     
     
  #72  
Old Posted Aug 29, 2014, 3:14 PM
Spring2008 Spring2008 is offline
BANNED
 
Join Date: Apr 2008
Location: Lower Mount Royal, Calgary
Posts: 5,147
The steel on the west side going up super fast.
Reply With Quote
     
     
  #73  
Old Posted Aug 29, 2014, 4:16 PM
H.E.Pennypacker's Avatar
H.E.Pennypacker H.E.Pennypacker is offline
Registered User
 
Join Date: May 2013
Posts: 1,941
^ No kidding .. I was by there a handful of days ago with no steel and then drive by it last night to see that much gone up in a matter of a week
Reply With Quote
     
     
  #74  
Old Posted Aug 29, 2014, 4:24 PM
Govertical's Avatar
Govertical Govertical is offline
Registered User
 
Join Date: Sep 2009
Location: Calgary
Posts: 501
I love how the steel looks in those interior shots, reminds me of clay or something being pulled or stretched! is there a tight deadline on this one?, I mean is that why they're flying so quickly?
Reply With Quote
     
     
  #75  
Old Posted Aug 29, 2014, 5:12 PM
Chadillaccc's Avatar
Chadillaccc Chadillaccc is offline
ARTchitecture
 
Join Date: Feb 2011
Location: Cala Ghearraidh
Posts: 22,842
It is due to open in mid-2016. I also love the interior. It is going to be absolutely incredible. I think a large portion of the construction timeline will be dedicated to just getting the interior right, as it is pretty advanced stuff.


Quote:
Originally Posted by H.E.Pennypacker View Post
^ No kidding .. I was by there a handful of days ago with no steel and then drive by it last night to see that much gone up in a matter of a week
Yeah man, these pics are from Wednesday too, so they could be up to the 4th floor with steel by now, at that pace.
__________________
Strong & Free

Mohkínstsis — 1.6 million people at the Foothills of the Rocky Mountains, 400 high-rises, a 300-metre SE to NW climb, over 1000 kilometres of pathways, with 20% of the urban area as parkland.
Reply With Quote
     
     
  #76  
Old Posted Sep 6, 2014, 4:34 AM
Chadillaccc's Avatar
Chadillaccc Chadillaccc is offline
ARTchitecture
 
Join Date: Feb 2011
Location: Cala Ghearraidh
Posts: 22,842
Apparently there is going to be a ~$2 million art piece incorporated into the project as well They have narrowed the list to 4 submissions, and will release the winning design later this year


Also, did you know that the wood from the old St. Patrick's Bridge is going to be incorporated into the structures currently UC on St. Patrick's Island Park? Very cool!
__________________
Strong & Free

Mohkínstsis — 1.6 million people at the Foothills of the Rocky Mountains, 400 high-rises, a 300-metre SE to NW climb, over 1000 kilometres of pathways, with 20% of the urban area as parkland.
Reply With Quote
     
     
  #77  
Old Posted Sep 6, 2014, 4:45 AM
RyLucky's Avatar
RyLucky RyLucky is offline
Registered User
 
Join Date: Feb 2012
Posts: 2,498
Quote:
Originally Posted by Chadillaccc View Post
Apparently there is going to be a ~$2 million art piece incorporated into the project as well They have narrowed the list to 4 submissions, and will release the winning design later this year


Also, did you know that the wood from the old St. Patrick's Bridge is going to be incorporated into the structures currently UC on St. Patrick's Island Park? Very cool!
Ye be the harbinger of good fortune!
Reply With Quote
     
     
  #78  
Old Posted Sep 6, 2014, 9:35 PM
Spring2008 Spring2008 is offline
BANNED
 
Join Date: Apr 2008
Location: Lower Mount Royal, Calgary
Posts: 5,147
Quote:
Originally Posted by Chadillaccc View Post
Apparently there is going to be a ~$2 million art piece incorporated into the project as well They have narrowed the list to 4 submissions, and will release the winning design later this year
Awesome, was wondering about this. I believe public art will be mandatory for the Central Library site as well.
Reply With Quote
     
     
  #79  
Old Posted Sep 7, 2014, 5:10 AM
flamesfan101 flamesfan101 is offline
Registered User
 
Join Date: Aug 2008
Posts: 83
Quote:
Originally Posted by Chadillaccc View Post
Apparently there is going to be a ~$2 million art piece incorporated into the project as well They have narrowed the list to 4 submissions, and will release the winning design later this year
Is this in addition to the $250,000 commission awarded to Patrick Marold?

http://www.nmc.ca/pdf/NMC_Public_Art...ease_FINAL.pdf
Reply With Quote
     
     
  #80  
Old Posted Sep 7, 2014, 6:17 PM
Chadillaccc's Avatar
Chadillaccc Chadillaccc is offline
ARTchitecture
 
Join Date: Feb 2011
Location: Cala Ghearraidh
Posts: 22,842
I'm not sure. I just read in the East Village news letter that at least 1% of the budget for the NMC is going to public art, 1% of $170 million is $1.7 million, so around 2 million. Also that there was an international request for qualifications that received 60 entries from artists on 3 continents, and that they've narrowed the list to 4.
__________________
Strong & Free

Mohkínstsis — 1.6 million people at the Foothills of the Rocky Mountains, 400 high-rises, a 300-metre SE to NW climb, over 1000 kilometres of pathways, with 20% of the urban area as parkland.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Calgary > Projects & Construction Updates
Forum Jump



Forum Jump


All times are GMT. The time now is 9:55 PM.

     
SkyscraperPage.com - Archive - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2024, vBulletin Solutions, Inc.